P.W.E. Hongkong.

Q 48

(b.) Nullah, West of Farm Lot 49, Wongneichong.—This work was undertaken in connection with the development of the adjoining lots, but was not completed during the year. It consists of an extension of the existing 6'0" x 5'0" culvert from a point 170 feet South of I.L. 1926 to the road bridge South-West of F.L. 49. The total length trained was 403 feet.

1920 Estimates, $ 5,000.00

1920 Expenditure, $ 4,738.51

(c.) General Works.—A considerable amount of training work was done during the year, the most important items being the training of the stream-course, East of I.L. 2237, Bowen Road, and of the channel, West of Victoria Hospital; the extension of the nullah at No. 12 Bridge, Shaukiwan; the training of the nullah, North-West of I.L. 2270, Wongneichong, (incomplete); the stream-course between the Peak Road and the Peak Chair-Coolie Quarters; the stream-course between Findlay Road Extension and Craigmin Road; the branch stream-course, West of R.B.L. 42, and of the stream-course, South-East of R.B.L. 137. The total lengths trained were 1,842 feet.

1920 Estimates, $ 20,429.77

1920 Supplementary Vote, $ 10,000.00

1920 Expenditure (from Government funds), $ 16,750.00

1920 Expenditure (contributions by various lessees, &c.), $ 608.66

103. Miscellaneous Drainage Works :

(a.) Main sewer to intercept drainage from houses on West side of Mount Kellett.—This work, which consists of the laying of a 6″ pipe sewer from a point, West of Cameron Villas, to join the sewer which was laid in 1906 from the Matilda Hospital to Kellett Bay, was completed during the year.

1920 Estimates, $ 10,500.00

1920 Expenditure, $ 7,230.96

(b.) General Works.—Considerable lengths of storm-water drains and sewers were laid during the year, the principal works being the extension of a 12" storm-water drain from Hill Road to I.L. 834; the relaying of a 9" sewer between Hill Road and I.L. 834; alterations to a culvert below I.L. 2137; the extension of 9" and 6″ sewers to S.I.L. 443, Sai Wan Ho, referred to in paragraph 100 (b.) of last year's report; the construction of 21" and 18" storm-water drains to S.I.L. 443; the extension of a 12" storm-water drain in the road, South of Wongneichong Village, a 6" sewer to I.L.'s. 2138 and 2260, Conduit Road, a 6" sewer to European Officers' Quarters, Leighton Hill, and a 6" sewer to the...

Edit History

2026-05-06 22:41:12 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
P.W.E. Hongkong. Q 48 (b.) Nullah, West of Farm Lot 49, Wongneichong.—This work was undertaken in connection with the development of the adjoining lots, but was not completed during the year. It consists of an extension of the existing 6'0" x 5'0" culvert from a point 170 feet South of I.L. 1926 to the road bridge South-West of F.L. 49. The total length trained was 403 feet. 1920 Estimates, $ 5,000.00 1920 Expenditure, $ 4,738.51 (c.) General Works.—A considerable amount of training work was done during the year, the most important items being the training of the stream-course, East of I.L. 2237, Bowen Road, and of the channel, West of Victoria Hospital; the extension of the nullah at No. 12 Bridge, Shaukiwan; the training of the nullah, North-West of I.L. 2270, Wongneichong, (incomplete); the stream-course between the Peak Road and the Peak Chair-Coolie Quarters; the stream-course between Findlay Road Extension and Craigmin Road; the branch stream-course, West of R.B.L. 42, and of the stream-course, South-East of R.B.L. 137. The total lengths trained were 1,842 feet. 1920 Estimates, $ 20,429.77 1920 Supplementary Vote, $ 10,000.00 1920 Expenditure (from Government funds), $ 16,750.00 1920 Expenditure (contributions by various lessees, &c.), $ 608.66 103. Miscellaneous Drainage Works : (a.) Main sewer to intercept drainage from houses on West side of Mount Kellett.—This work, which consists of the laying of a 6″ pipe sewer from a point, West of Cameron Villas, to join the sewer which was laid in 1906 from the Matilda Hospital to Kellett Bay, was completed during the year. 1920 Estimates, $ 10,500.00 1920 Expenditure, $ 7,230.96 (b.) General Works.—Considerable lengths of storm-water drains and sewers were laid during the year, the principal works being the extension of a 12" storm-water drain from Hill Road to I.L. 834; the relaying of a 9" sewer between Hill Road and I.L. 834; alterations to a culvert below I.L. 2137; the extension of 9" and 6″ sewers to S.I.L. 443, Sai Wan Ho, referred to in paragraph 100 (b.) of last year's report; the construction of 21" and 18" storm-water drains to S.I.L. 443; the extension of a 12" storm-water drain in the road, South of Wongneichong Village, a 6" sewer to I.L.'s. 2138 and 2260, Conduit Road, a 6" sewer to European Officers' Quarters, Leighton Hill, and a 6" sewer to the...
Baseline (Original)
P.W.E. Hongkong. Q 48 (b.) Nullah, West of Farm Lot 49, Wongneichong.—This work was undertaken in connection with the development of the adjoin- ing lots, but was not completed during the year. It consists of an extension of the existing 6'0" x 5'0" culvert from a point 170 feet South of I.L. 1926 to the road bridge South-West of F.L. 49. The total length trained was 403 feet. 1920 Estimates, 1920 Expenditure, + $ 5,000.00 4,738.51 (r.) General Works.—A considerable amount of training work was done during the year, the most important items being the train- ing of the stream-course, East of I.L. 2237, Bowen Road, and of the channel, West of Victoria Hospital; the extension of the nullab at No. 12 Bridge, Shaukiwan; the training of the nullah, North- West of I.L. 2270, Wongneichong, (incomplete); the stream- course between the Peak Road and the Peak Chair-Coolie Quarters; the stream-course between Findlay Road Extension and Craigmin Road; the branch stream-course, West of R.B.L. 42, and of the stream-course, South-East of R.B.L. 137. The total lengths trained were 1,842 feet. 1920 Estimates, 1920 Supplementary Vote, 1920 Expenditure (from Government funds), $ 20,429.77 1920 Expenditure (contri- butions by various lessees, &c.), 103. Miscellaneous Drainage Works :-- $ 10,000.00 16,750.00 $ 26,750.00 608.66 21,038.43 (a.) Main sewer to intercept drainage from houses on West side of Mount Kellett.—This work, which consists of the laying of a 6′′ pipe sewer from a point, West of Cameron Villas, to join the sewer which was laid in 1906 from the Matilda Hospital to Kellett Bay, was completed during the year. 1920 Estimates, 1920 Expenditure, $ 10,500.00 7,230,96 (b.) General Works.-Considerable lengths of storm-water drains and sewers were laid during the year, the principal works being the extension of a 12" storm-water drain from Hill Road to I.L. 834; the relaying of a 9" sewer between Hill Road and I.L. 834; alterations to a culvert below I.L. 2137; the extension of 9" and 6′′ sewers to S.I.L. 443, Sai Wan Ho, referred to in paragraph 100 (b.) of last year's report; the construction of 21" and 18" storm-water drains to S.I.L. 443; the extension of :-a 12" storm-water drain in the road, South of Wongneichong Village, a 6" sewer to I.L.'s. 2138 and 2260, Conduit Road, a 6" sewer to European Officers' Quarters, Leighton Hill, and a 6" sewer to the રી
2026-05-06 22:41:12 · Baseline
View content

P.W.E. Hongkong.

Q 48

(b.) Nullah, West of Farm Lot 49, Wongneichong.—This work was undertaken in connection with the development of the adjoin- ing lots, but was not completed during the year. It consists of an extension of the existing 6'0" x 5'0" culvert from a point 170 feet South of I.L. 1926 to the road bridge South-West of F.L. 49. The total length trained was 403 feet.

1920 Estimates,

1920 Expenditure,

+

$ 5,000.00 4,738.51

(r.) General Works.—A considerable amount of training work was done during the year, the most important items being the train- ing of the stream-course, East of I.L. 2237, Bowen Road, and of the channel, West of Victoria Hospital; the extension of the nullab at No. 12 Bridge, Shaukiwan; the training of the nullah, North- West of I.L. 2270, Wongneichong, (incomplete); the stream- course between the Peak Road and the Peak Chair-Coolie Quarters; the stream-course between Findlay Road Extension and Craigmin Road; the branch stream-course, West of R.B.L. 42, and of the stream-course, South-East of R.B.L. 137. The total lengths trained were 1,842 feet.

1920 Estimates,

1920 Supplementary Vote,

1920 Expenditure (from

Government funds), $ 20,429.77

1920 Expenditure (contri-

butions by various

lessees, &c.),

103. Miscellaneous Drainage Works :--

$ 10,000.00 16,750.00

$ 26,750.00

608.66

21,038.43

(a.) Main sewer to intercept drainage from houses on West side of Mount Kellett.—This work, which consists of the laying of a 6′′ pipe sewer from a point, West of Cameron Villas, to join the sewer which was laid in 1906 from the Matilda Hospital to Kellett Bay, was completed during the year.

1920 Estimates,

1920 Expenditure,

$ 10,500.00 7,230,96

(b.) General Works.-Considerable lengths of storm-water drains and sewers were laid during the year, the principal works being the extension of a 12" storm-water drain from Hill Road to I.L. 834; the relaying of a 9" sewer between Hill Road and I.L. 834; alterations to a culvert below I.L. 2137; the extension of 9" and 6′′ sewers to S.I.L. 443, Sai Wan Ho, referred to in paragraph 100 (b.) of last year's report; the construction of 21" and 18" storm-water drains to S.I.L. 443; the extension of :-a 12" storm-water drain in the road, South of Wongneichong Village, a 6" sewer to I.L.'s. 2138 and 2260, Conduit Road, a 6" sewer to European Officers' Quarters, Leighton Hill, and a 6" sewer to the

રી