B. O. Work.
Q 22 was commenced. The formation of the large area known as I.L. 2273, Whitfield, for the same Company was also commenced. On the latter area, two large fuel tanks and other buildings were constructed and the erection of three additional tanks was commenced.
In the compound of St. John's Cathedral, buildings comprising a Church Hall, Caretakers' Quarters, etc., were erected and practically completed by the end of the year.
At Quarry Bay, the erection of a block containing 6 residential flats on Q.B.I.L. 7 was commenced, some additions to workshops on Q.B.I.L. 2 were commenced and progress was made with reclamation and other works on Q.B.M.L's. 1 and 2.
Two large blocks containing 33 residential flats on K.I.L's. 715 and 721, Nathan Road, were erected.
The following is a summary of the smaller works which have been completed or commenced during the year, in addition to the larger ones specifically mentioned above:-
Works completed.
37 European houses in Hongkong including 1 in the Peak District,
27 " Kowloon,
21 Chinese houses in Victoria,
19 " Hongkong Villages,
139 " Yaumati and Mongkoktsui,
6 " Taikoktsui,
17 " Shamshuipo,
5 " Kowloon Villages,
besides numerous buildings of a non-domestic character in Hong-kong and in Kowloon.
Works commenced.
15 European houses in Hongkong including 3 in the Peak District,
3 " Kowloon,
23 Chinese houses in Victoria,
17 " Hongkong Villages,
112 " Yaumati and Mongkoktsui,
15 " Taikoktsui,
94 " Shamshuipo,
2 " Kowloon Villages,
26 " on the reclamation at the head of Kowloon Bay,
besides numerous other buildings of a non-domestic character in Hongkong and in Kowloon.
B. O. Work.
Q 22
was commenced. The formation of the large area known as I.L. 2273, Whitfeild, for the same Company was also commenced. On the latter area, two large fuel tanks and other buildings were constructed and the erection of three additional tanks Was commenced.
In the compound of St. John's Cathedral, buildings compris- ing a Church Hall. Caretakers' Quarters, etc., were erected and practically completed by the end of the year.
At Quarry Bay, the erection of a block containing 6 re- sidential flats on Q.B.I.L. 7 was commenced, some additions to workshops on Q.B.I.L. 2 were commenced and progress was made with reclamation and other works on Q.B.M.L's. 1 and 2.
Two large blocks containing 33 residential flats on K.I.L's. 715 and 721, Nathan Road, were erected,
The following is a summary of the smaller works which have been completed or commenced during the year, in addition to the larger ones specifically mentioned above:-
Works completed.
37 European houses in Hongkong including 1 in the Peak
5
27
District,
Kowloon,
21 Chinese houses in Victoria,
19
139
6
"
17
5
Hongkong Villages,
Yaumati and Mongkoktsui, Taikoktsui,
Shamshuipo, and
Kowloon Villages,
besides numerous buildings of a non-domestic character in Hong- kong and in Kowloon.
Works commenced.
15 European houses in Hongkong including 3 in the Peak
3
District, Kowloon,
23 Chinese houses in Victoria,
>>
17
23
112
15
"
94
2
:7
26
**
Hongkong Villages,
Yaumati and Mongkoktsui, Taikoktsui,
Shamshuipo,
Kowloon Villages, and
on the reclamation at the head of Kow-
loon Bay, besides numerous other buildings of a non-domestic character in Hongkong and in Kowloon,