P.W.E. Hongkong.
Q 40
A flight of steps was constructed in Sands Street, east of the nullah, to give better access to the houses recently erected on I. L. Part of the cost of this work was borne by the lessees of the lot mentioned.
2091.
Railings were erected on Tregunter Path.
The flight of steps from Queen's Road East to Kennedy Road, between I. L.'s 2072 and 2079, was completed.
The island at the junction of Robinson and Seymour Roads was cut back to improve the alignment of Robinson Road and the connection of the two roads mentioned.
The new road which has been formed on the east side of the nullah in Hill Road in connection with extensive building operations on I.L. 795 was kerbed, channelled, and surfaced with 4" macadam, the footpath being paved with granolithic. A concrete bridge has been constructed spanning the nullah.
Consequent upon the erection of new buildings, kerbing and channelling operations were executed in the following roads, the footpaths being paved and any necessary alterations in levels or alignment being effected:--
Babington Path, Bonham Road, Centre Street, First Street, Gordon Road, High Street, Prava East,
Sands Street,
Sing Woo Road, Tai On Street, Shaukiwan Road, Wanchai Road, Wing Hing Street, Whitfield and
Wongneichong Roads.
$35,000.00
1919 Estimates,
1919 Sup. Vote,
1919 Expenditure,
99. Training Nullahs:—
$45,000.00
$80,000.00
$72,478.28
Onl
(a.) Colonial Cemeteries.—This work was undertaken on account of the formation of stagnant pools in the bed of the stream-course. The training comprised the laying of a cement concrete invert between the existing side-walls of the stream-course, and the construction of channels, which vary in size from 3′ 6′′ × 3′ 6′′ to 2′ 3′′ x 2' 3", in cement concrete, with semi-circular inverts and vertical sides.
The total length trained was 1,236 feet.
1919 Estimates,
1919 Sup. Vote,
1919 Expenditure,
$3,100.00
$600.00
$3,700.00
$3,685.11
P.W.E. Hongkong.
Q 40
A flight of steps was constructed in Sands Street, east of the nullah, to give better access to the houses recently erected on I. L. Part of the cost of this work was borne by the lessees of the lot mentioned.
2091.
Railings were erected on Tregunter Path.
The flight of steps from Queen's Road East to Kennedy Road, between I. L.'s 2072 and 2079, was completed.
The island at the junction of Robinson and Seymour Roads was cut back to improve the alignment of Robinson Road and the connection of the two roads mentioned.
The new road which has been formed on the east side of the nullah in Hill Road in connection with extensive building operations on I.L. 795 was kerbed, channelled, and surfaced with 4" macadam, the footpath being paved with granolithic. A concrete bridge has been constructed spanning the nullah.
Consequent upon the erection of new buildings, kerbing and channelling operations were executed in the following roads, the footpaths being paved and any necessary alterations in levels or alignment being effected:--
Babington Path, Bonham Road, Centre Street, First Street, Gordon Road, High Street, Prava East,
Sands Street,
Sing Woo Road, Tai On Street, Shaukiwan Road, Wanchai Road, Wing Hing Street, Whitfield and
Wongneichong Roads.
$35,000.00
1919 Estimates,
1919 Sup. Vote,
1919 Expenditure,
99. Training Nullahs:—
45,000.00
$80,000.00
72,478.28
Onl
(a.) Colonial Cemeteries.—This work was undertaken account of the formation of stagnant pools in the bed of the stream-. course. The training comprised the laying of a cement concrete invert between the existing side-walls, of the stream-course, and the construction of channels, which vary in size from 3′ 6′′ × 3′ 6′′ to 2′ 3′′ x 2' 3", in cement concrete, with semi-circular inverts and vertical sides.
The total length trained was 1,236 feet.
1919 Estimates, 1919 Sup. Vote,.
1919 Expenditure,
$3,100.00 600.00
$3,700.00 3,685.11