B. O. Work.
40. Reclamations. The following is a statement of the private reclamations which were completed or in progress during the year:-
Hung Hom Marine Lot 3, Hung Hom, (completed)
Area in sq. ft.
491,000
New Kowloon Inland Lots 190 & 191, Laichikok, (in progress)
618,000
Aberdeen Inland Lots 81 to 88, Aberdeen, (in progress),
165,000
Kowloon Marine Lot 93, Hung Hom, (completed),
73,500
The areas stated are those of the lots, which in some cases extend further inland than old high water mark and are therefore not exclusively reclaimed from the sea.
In addition to the above, considerable progress was made with the works in connection with the reclamation of about 230 acres of foreshore and sea-bed at the head of Kowloon Bay referred to in last year's Report.
41. Principal Works of a Private Nature.—The extension to the School of Anatomy to accommodate the School of Physiology, and the new building on I.L. 1859 to contain the Schools of Pathology and Tropical Medicine in connection with the Hongkong University were completed. The quarters on I.L. 1853 for one of the junior officers and the Students' Union Building were also completed during the year.
The buildings constituting the Hongkong Electric Company's new power station on M.L. 321 were completed.
The new building on I.L. 82 for the Missions Etrangères was completed.
The Repulse Bay Hotel, on R.B.L. 142, was completed and the erection of a residential wing in connection therewith was commenced.
The three new building slips on H. H. M. L. 3, referred to in last year's Report, belonging to the Hongkong and Whampoa Dock Company, were completed. Two large blocks of quarters to accommodate the Company's European Staff were completed and two other blocks were commenced. The preparation of sites for the erection of further blocks of quarters was also in hand at the close of the year.
The erection of a Platers' shed and a sawmill and extensions to the machine shop and other works were also commenced.
The large reinforced concrete godown for the Hongkong and Kowloon Wharf and Godown Company, on K.M.L. 91, referred to in last year's Report, was practically completed.
A large reinforced concrete godown, on K.M.L. 88, as well as a wharf for ocean-going steamers and other structures for the Ocean Steamship Company, was completed.
The erection of a power house for the China Light and Power Company on K.M.L. 93, Hung Hom, was commenced.
15
B. O. Work.
40. Reclamations. The following is a statement of the private reclamations which were completed or in progress during the year:-
Hung Hom Marine Lot 3, Hung Hom,
(completed)
Area in sq. ft.
491,000
New Kowloon Inland Lots 190 & 191,
Laichikok, (in progress)
618,000
Aberdeen Inland Lots 81 to 88, Aber-
deen, (in progress),
165,000
Kowloon Marine Lot 93, Hung Hom,
(completed),
73,500
The areas stated are those of the lots, which in some cases extend further inland than old high water mark and are therefore not exclusively reclaimed from the sea.
In addition to the above, considerable progress was made with the works in connection with the reclamation of about 230 acres of foresliore and sea-bed at the head of Kowloon Bay referred to in last year's Report.
41. Principal Works of a Private Nature.—The extension to the School of Anatomy to accommodate the School of Physiology, and the new building on 1.L. 1859 to contain the Schools of Pathology and Tropical Medicine in connection with the Hongkong University were completed. The quarters on I.L. 1853 for one of the junior officers and the Students' Union Building were also completed during the year.
The buildings constituting the Hongkong Electric Company's new power station on M.L. 321 were completed.
+
The new building on I.L. 82 for the Missions Etrangères was completed.
The Repulse Bay Hotel, on R.B.L. 142, was completed and the erection of a residential wing in connection therewith was commenced.
The three new building slips on H. H. M. L. 3, referred to in last year's Report, belonging to the Hongkong and Whampoa Dock Company, were completed. Two large blocks of quarters to accom- modate the Company's European Staff were completed and two other blocks were commenced. The preparation of sites for the erection of further blocks of quarters was also in hand at the close of the year.
The erection of a Platers' shed and a sawmill and extensions to the machine shop and other works were also commenced.
The large reinforced concrete godown for the Hongkong and Kowloon Wharf and Godown Company, on K.M.L. 91, referred to in last year's Report, was practically completed.
A large reinforced concrete godown, on K.M.L. 88, as well as a wharf for ocean-going steamers and other structures for the Ocean Steamship Company, was completed.
The erection of a power house for the China Light and Power Company on K.M.L. 93, Hung Hom, was commenced.