P.W.E. Kowloon.
Q 71
74
Some delay was caused by the difficulty of obtaining suitable stones for facing the basement and retaining walls, but, at the end of the year, the main retaining wall was completed together with the retaining walls for the approach path. The foundations and walls of the houses were also completed up to the ground floor level.
1918 Estimates, ...$68,000.00 | Total Estimates,...
Expenditure to
1918 Expenditure, 26,936.16 31/12/18, .$26,958.21
117. Market at Shamshuipo.-The market was completed and handed over to the Sanitary Department in June. It comprises two separate market structures, each 115' 0" x 50' 0" open all round, a room for a caretaker, 12′ 0′′ x 12' 0", with cookhouse and store attached and a kitchen 20' 0" x 7' 9" for the use of stall-holders. A well with storage tank and pump is also provided.
The two market structures consist merely of a flat ferro-concrete roof supported on brick pillars built and rendered in cement mortar. The floors are of lime and cement concrete, 4" thick, surfaced with fine cement concrete, 2" thick. The other buildings are of red Canton brick built in lime mortar and pointed in cement mortar with flat roofs of ferro-concrete. Twenty incandescent electric lamps were installed for lighting the market buildings.
By the end of the year, all liabilities in connection with the work had been discharged.
|
1918 Estimates, ...$10,000.00 Total Estimates, ..$24,000.00
Expenditure to
1918 Expenditure,
9,981.29 31/12/18,
26,805.19
118. Hau Pui Loong Cemetery,-Quarters for Sextons.---This contract was completed towards the end of 1917 and the works were fully described in the Report for that year. The expenditure in 1918 was in respect of the retention money only.
1918 Estimates,...$300.00 | Total Estimates
1918 Expenditure,
Expenditure to
.$2,100.00
300.00 31/12/18, ....... 1,760.00
119. Royal Observatory,-New Magnetic Hut.-This work was undertaken owing to the old hut having become very decayed and white-ant eaten and was completed before the close of the year. It consists of a shed, 16' 0"x 12′ 0′′ internally, constructed of timber framing with weather boarding, the roof being covered with Ruberoid. The floor is of concrete and is raised above the ground on brick piers. The work was put together with brass screws and copper nails throughout in order not to affect the instruments housed in the shed.
|
1918 Estimates,.........$2,000.00 Total Estimates,..$2,000.00 Supplementary Vote,..
13.91
1918 Expenditure, ...$2,013.91
Expenditure to
31/12/18,
2,013.91
P.W.E. Kowloon.
Q 71
74
Some delay was caused by the difficulty of obtaining suitable stones for facing the basement and retaining walls, but, at the end of the year, the main retaining wall was completed together with the retaining walls for the approach path. The foundations and walls of the houses were also completed up to the ground floor level.
1918 Estimates, ...$68,000.00 | Total Estimates,...
Expenditure to
1918 Expenditure, 26,936.16 31/12/18, .$26,958.21
117. Market at Shamshuipo.-The market was completed and handed over to the Sanitary Department in June. It comprises two separate market structures, each 115' 0" x 50' 0" open all round, a room for a caretaker, 12′ 0′′ x 12' 0", with cookhouse and store attached and a kitchen 20' 0" x 7' 9" for the use of stall- holders. A well with storage tank and pump is also provided.
The two market structures consist merely of a flat ferro-con- crete roof supported on brick pillars built and rendered in cement mortar. The floors are of lime and cement concrete, 4" thick, surfaced with fine cement concrete, 2" thick. The other buildings are of red Canton brick built in lime mortar and pointed in cement mortar with flat roofs of ferro-concrete. Twenty incandescent electric lamps were installed for lighting the market buildings.
By the end of the year, all liabilities in connection with the work had been discharged.
|
1918 Estimates, ...$10,000.00 Total Estimates, ..$24,000.00
Expenditure to
1918 Expenditure,
9,981.29 31/12/18,
26,805.19
118. Hau Pui Loong Cemetery,-Quarters for Sextons.---This contract was completed towards the end of 1917 and the works were fully described in the Report for that year. The expenditure in 1918 was in respect of the retention money only. 1918 Estimates,...$300.00 | Total Estimates
1918 Expenditure,
Expenditure to
.$2,100.00
300.00 31/12/18, ....... 1,760.00
119. Royal Observatory,-New Magnetic Hut.-This work was undertaken owing to the old hut having become very decayed and white-ant eaten and was completed before the close of the
year. It consists of a shed, 16' 0"x 12′ 0′′ internally, constructed of timber framing with weather boarding, the roof being covered with Ruberoid. The floor is of concrete and is raised above the ground on brick piers. The work was put together with brass screws and copper nails throughout in order not to affect the in- struments housed in the shed.
|
1918 Estimates,.........$2,000.00 Total Estimates,..$2,000.00 Supplementary Vote,..
13.91
1918 Expenditure, ...$2,013.91
Expenditure to
31/12/18,
2,013.91