P.W.E. Kowloon.
Q 80
9th July. The walls are in Canton red brickwork finished with granolithic and the roof is of reinforced concrete.
1917 Estimates, ... $2,100.00 | Total Estimates,
1917 Expenditure, 1,680.61
$2,100.00
Expenditure to 31/12/17, 1,680.61
125. Han Pui Loong Cemetery,--Quarters for Sextons.—A permanent building has been erected at a cost of $1,760.00 to take the place of the matsheds in Ma Tau Wei formerly occupied by the Sextons. It contains an office and store, 3 living rooms, kitchen and latrine, with two small verandahs. The walls are of rubble masonry in lime mortar, pointed in cement, the floors are of cement concrete and the roof over verandahs and office is also of cement concrete, the remainder of the roof being of pan and roll tiling. The work was completed, but a balance of $300.00 remained to be paid in 1918.
1917 Estimates, ... $2,100.00 Total Estimates,
1917 Expenditure, 1,460.00
$2,100.00
Expenditure to 31/12/17, 1,460.00
126. Roads:--
(a.) Surfacing space in front of Railway Terminus.—The whole of the area in front of the Railway Station was treated with asphaltum to give a waterproof coating to the macadam.
1917 Estimates, $1,000.00
1917 Expenditure, 841.86
(b.) General Works. The following is a statement of the works executed under this heading:-
(i.) Waterloo Road—Kerbing, channelling, forming and macadamizing northern portion of roadway between Nathan Road and Railway Bridge and full width of roadway between Nathan Road and Shanghai Street, and providing the necessary drainage (part cost only, the balance being defrayed from the Maintenance and Improvement Votes),
(ii.) Shanghai Street—Kerbing, channelling, forming to new levels and macadamizing carriageway adjoining K.I.L. 717, $3,947.78; $8,763.76
(iii.) Argyle Street—Constructing reinforced concrete bridge over nullah to give access to K.I.L. 1259 in Nathan Road, $2,106.28
(iv.) Mody and Chatham Roads—Laying sand carpeting to footway in Chatham Road in front of K.I.L.'s 576 and 525 and granolithic paving to footway in Mody Road on south side of K.I.L. 525, $1,575.95
P.W.E. Kowloon.
Q 80
9th July. The walls are in Canton red brickwork finished with granolithic and the roof is of reinforced concrete.
1917 Estimates, ... $2,100.00 | Total Estimates,
1917 Expenditure, 1,680.61
$2,100.00
Expenditure to
3112:17,
1,680.61
125. Han Pui Loong Cemetery,--Quarters for Sertons.—A permanent building has been erected at a cost of $1,760.00 to take the place of the matsheds in Ma Tau Wei formerly occupied by the Sextons. It contains an office and store, 3 living rooms, kitchen and latrine, with two small verandahs. The walls are of rubble masonry in lime mortar, pointed in cement, the floors are of cement concrete and the roof over verandahs and office is also of cement concrete, the remainder of the roof being of pan and roll tiling. The work was completed, but a balance of $300.00 remained to be paid in 1918.
1917 Estimates, ... $2,100.00 Total Estimates,
1917 Expenditure, 1,460.00
126. Roads :--
$2,100.00
Expenditure to
31/12/17,
..
1,460.00
(a.) Surfacing space in front of Railway Terminus.--The whole of the area in front of the Railway Station was treated with asphaltum to give a waterproof coating to the macadam.
1917 Estimates,
1917 Expenditure,
$1,000.00 841.86
(b.) General Works. The following is a statement of the works executed under this heading :-
(i.) Waterloo Road -Kerbing, channelling, form-
ing and macadamizing northern portion of roadway between Nathan Road and Railway Bridge and full width of roadway between Nathan Road and Shanghai Street, and provi- ding the necessary drainage (part cost only, the balance being defrayed from the Main- tenance and Improvement Votes),.............
Street-Kerbing, Street-Kerbing,
channelling,
forming to new levels and macadamizing carriageway adjoining K.I.L. 717,
$3,947.78
(ii) Shanghai
8,763.76
(iii.) Argyle Street-Constructing reinforced con- crete bridge over nullah to give access to K.I.L. 1259 in Nathan Road,
2,106.28
(iv.) Mody and Chatham Roads--Laying sand carpeting to footway in Chatham Road in front of K.I.L.'s 576 and 525 and granolithic paving to footway in Mody Road on south side of K.I.L. 525,
1,575.95