P.W.E. New Territories.

Page 88

(d.) General Works. The only items worth recording under this heading are the following:

Kerbing, channelling and laying granolithic paving opposite N.K.I.L.s 27 and 41 (Shamshuipo),

Kerbing, channelling and laying granolithic paving opposite N.K.I.L. 40 (Shamshuipo),

1914 Estimates, $3,000.00 1914 Expenditure, $858.97 $551 $153

141. Training stream behind old Railway Bungalows, Tai Po. This work was commenced in August and by the end of the year a length of 200 feet of 5′ 0″ x 3' 0" cement concrete nullah had been constructed and the banks on either side levelled off.

1914 Estimates, $2,000.00 Total Estimates, 1914 Expenditure, $1,979.18 Expenditure to 31/12/14, $2,000.00 $1,979.18

142. Miscellaneous Drainage Works.--The following were the only items of work carried out under this heading during the year:--

(i.) Constructing short lengths of channel at Lai Chi Kok,

(i.) Improving the inverts of channels in Cheung Chau Village,

1914 Estimates, $5,000.00 1914 Expenditure, $351.76 $72.47 $279.29

143. Shamshuipo—Reclamation Scheme to provide sites for lessees dislodged from old Village.—The second contract, which was described in last year's Report (paragraph 146) was completed in April at a cost of $50,581.05. In addition to the two contracts for reclamation work, the large channel referred to in paragraph 115 of the Report for 1912 and sundry minor works were executed under this heading.

1914 Estimates $15,000.00 Total Estimates, $84,000.00 1914 Expenditure, $13,164.05 Expenditure to 31/12/14, $77,395.97

144. Fencing around Police Stations.—To afford greater protection to the Police Stations at Shataukok, Sheung Shui, Au Tau and Ping Shan, unclimbable iron fencing has been erected at a distance of about 30 yards from the buildings with the necessary gates, etc. The stations are practically surrounded by the fencing.

1914 Estimates, $4,500.00 1914 Sup. Vote, $120.00 $4,620.00 1914 Expenditure, $4,617.15

Page 88

Edit History

2026-05-06 09:08:24 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
P.W.E. New Territories. Page 88 (d.) General Works. The only items worth recording under this heading are the following: Kerbing, channelling and laying granolithic paving opposite N.K.I.L.s 27 and 41 (Shamshuipo), Kerbing, channelling and laying granolithic paving opposite N.K.I.L. 40 (Shamshuipo), 1914 Estimates, $3,000.00 1914 Expenditure, $858.97 $551 $153 141. Training stream behind old Railway Bungalows, Tai Po. This work was commenced in August and by the end of the year a length of 200 feet of 5′ 0″ x 3' 0" cement concrete nullah had been constructed and the banks on either side levelled off. 1914 Estimates, $2,000.00 Total Estimates, 1914 Expenditure, $1,979.18 Expenditure to 31/12/14, $2,000.00 $1,979.18 142. Miscellaneous Drainage Works.--The following were the only items of work carried out under this heading during the year:-- (i.) Constructing short lengths of channel at Lai Chi Kok, (i.) Improving the inverts of channels in Cheung Chau Village, 1914 Estimates, $5,000.00 1914 Expenditure, $351.76 $72.47 $279.29 143. Shamshuipo—Reclamation Scheme to provide sites for lessees dislodged from old Village.—The second contract, which was described in last year's Report (paragraph 146) was completed in April at a cost of $50,581.05. In addition to the two contracts for reclamation work, the large channel referred to in paragraph 115 of the Report for 1912 and sundry minor works were executed under this heading. 1914 Estimates $15,000.00 Total Estimates, $84,000.00 1914 Expenditure, $13,164.05 Expenditure to 31/12/14, $77,395.97 144. Fencing around Police Stations.—To afford greater protection to the Police Stations at Shataukok, Sheung Shui, Au Tau and Ping Shan, unclimbable iron fencing has been erected at a distance of about 30 yards from the buildings with the necessary gates, etc. The stations are practically surrounded by the fencing. 1914 Estimates, $4,500.00 1914 Sup. Vote, $120.00 $4,620.00 1914 Expenditure, $4,617.15 Page 88
Baseline (Original)
P.W.E. New Territories. P 88 (d.) General Works. The only items worth recording under this heading are the following: Kerbing, channelling and laying granolithic paving opposite N.K.I.L.s 27 and 41 (Shamshuipo), - Kerbing, channelling and laying granolithic paving opposite N.K.I.L. 40 (Shamshuipo), 1914 Estimates, 1914 Expenditure, .$3,000.00 858.97 $551 153 141. Training stream behind old Railway_Bungalows, Tai Po. This work was commenced in August and by the end of the year a length of 200 feet of 5′ 0′′ x 3' 0" cement concrete nullah had been constructed and the banks on either side levelled off. 1914 Estimates, ..$ 2,000.00 | Total Estimates, 1914 Expenditure,... 1,979.18 Expenditure to 31/12/14, ...$2,000.00 1,979 18 142. Miscellaneous Drainage Works.--The following were the only items of work carried out under this heading during the year :-- (i.) Constructing short lengths of channel at Lai Chi Kok, - (i.) Improving the inverts of channels in Cheung Chau Village, 1914 Estimates, . 1914 Expenditure, .$5,000.00 351.76 $ 72.47 279.29 143. Shamshuipo—Reclamation Scheme _to_provide_sites for lessees dislodged from old Village.—The second contract, which was described in last year's Report (paragraph 146) was completed in April at a cost of $50,581.05. In addition to the two contracts for reclamation work, the large channel referred to in paragraph 115 of the Report for 1912 and sundry minor works were execute d under this heading. 1914 Estimates......$15,000.00 | Total Estimates,.....$84,000.00 Expenditure to 1914 Expenditure,... 13.164.05 31/12 14, .......... 77.395.97 144. Fencing_around Police Stations.—To afford greater pro- tection to the Police Stations at Shataukok, Sheung Shui, Au Tau and Ping Shan, unclimbable iron fencing has been erected at a distance of about 30 yards from the buildings with the necessary gates, etc. The stations are practically surrounded by the fencing. 1914 Estimates, 1914 Sup. Vote, . 1914 Expenditure, $4,500.00 120.00 $4,620.00 4,617.15
2026-05-06 09:08:24 · Baseline
View content

P.W.E. New Territories.

P 88

(d.) General Works. The only items worth recording under this heading are the following:

Kerbing, channelling and laying granolithic

paving opposite N.K.I.L.s 27 and 41 (Shamshuipo), -

Kerbing, channelling and laying granolithic paving opposite N.K.I.L. 40 (Shamshuipo),

1914 Estimates,

1914 Expenditure,

.$3,000.00

858.97

$551

153

141. Training stream behind old Railway_Bungalows, Tai Po. This work was commenced in August and by the end of the year a length of 200 feet of 5′ 0′′ x 3' 0" cement concrete nullah had been constructed and the banks on either side levelled off.

1914 Estimates, ..$ 2,000.00 | Total Estimates,

1914 Expenditure,... 1,979.18

Expenditure to

31/12/14,

...$2,000.00

1,979 18

142. Miscellaneous Drainage Works.--The following were the only items of work carried out under this heading during the

year :--

(i.) Constructing short lengths of channel at Lai Chi

Kok,

-

(i.) Improving the inverts of channels in Cheung

Chau Village,

1914 Estimates, .

1914 Expenditure,

.$5,000.00

351.76

$ 72.47

279.29

143. Shamshuipo—Reclamation Scheme _to_provide_sites for lessees dislodged from old Village.—The second contract, which was described in last year's Report (paragraph 146) was completed in April at a cost of $50,581.05. In addition to the two contracts for reclamation work, the large channel referred to in paragraph 115 of the Report for 1912 and sundry minor works were execute d under this heading.

1914 Estimates......$15,000.00 | Total Estimates,.....$84,000.00

Expenditure to

1914 Expenditure,... 13.164.05 31/12 14, .......... 77.395.97

144. Fencing_around Police Stations.—To afford greater pro- tection to the Police Stations at Shataukok, Sheung Shui, Au Tau and Ping Shan, unclimbable iron fencing has been erected at a distance of about 30 yards from the buildings with the necessary gates, etc. The stations are practically surrounded by the fencing.

1914 Estimates, 1914 Sup. Vote, .

1914 Expenditure,

$4,500.00

120.00

$4,620.00

4,617.15