P 75

P.W.E. Kowloon,

the old Inspector's room and Charge room, including extensions of same, into a Charge room, 24′ 0″ × 15′ 6″; and the addition of 3 bathrooms, a drying-room and a kitchen.

In the case of the subsidiary building in the rear of the main building, an upper storey was added, containing two large dormitories, 47′ 2″ × 12′ 3″ and 46′ 4″ × 14′ 0″ for 8 Indian and 10 Chinese Constables respectively, besides bathrooms and a verandah, whilst, on the ground floor, a small bay containing the staircase to give access to the new upper floor was constructed.

The walls throughout are of Canton red brick covered externally with rough-cast plaster. The internal surfaces of the walls of the main building are plastered whilst those of the subsidiary building are pointed and limewashed. The floors of the main building are of hardwood nailed to fillets let into cement concrete and those of the subsidiary building are of reinforced concrete. The roofs, where pitched, are covered with the ordinary Chinese pan and roll tiling and, where flat, with reinforced concrete. The staircase to the upper storey of the subsidiary building is of reinforced concrete.

The buildings throughout are lit by electric light.

All liabilities were discharged before the close of the year.

1914 Estimates, 1914 Sup. Vote,

$ 2,500.00 | Total Estimates,

$6,500.00

9,200.00

$11,700.00

1914 Expenditure..

11,340.62

Expenditure to

31/12/14.

13,921.94

The reason for the large excess is that extensive alterations and additions were made after the date of the original estimate and it was also decided to proceed at once with certain portions of the scheme which it had been intended to allow to remain in abeyance.

125. Roads-General Works.--The following is a statement of the works executed under this heading except those of a trifling nature:

(i.) Ashley Road---forming carriageways and foot-ways around K.I.L. 110, including the necessary kerbing, channelling and drainage, (completed),

(ii) Constructing two reinforced concrete bridges over nullah in Portland Street, (completed),

(iii) Kerbing and channelling, etc., portions of area in front of new Railway Terminus to form approach to new Star Ferry Wharf, (completed),

(iv) Nathan Road-taking up and resetting kerbing and laying new channelling to west front of K.I.L. 571, (completed),

$1,758 692 583 122

* Certain private streets laid out on K.I.L. 410 were surrendered to Government in March 1914.

P 75

Edit History

2026-05-06 09:06:31 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
P 75 P.W.E. Kowloon, the old Inspector's room and Charge room, including extensions of same, into a Charge room, 24′ 0″ × 15′ 6″; and the addition of 3 bathrooms, a drying-room and a kitchen. In the case of the subsidiary building in the rear of the main building, an upper storey was added, containing two large dormitories, 47′ 2″ × 12′ 3″ and 46′ 4″ × 14′ 0″ for 8 Indian and 10 Chinese Constables respectively, besides bathrooms and a verandah, whilst, on the ground floor, a small bay containing the staircase to give access to the new upper floor was constructed. The walls throughout are of Canton red brick covered externally with rough-cast plaster. The internal surfaces of the walls of the main building are plastered whilst those of the subsidiary building are pointed and limewashed. The floors of the main building are of hardwood nailed to fillets let into cement concrete and those of the subsidiary building are of reinforced concrete. The roofs, where pitched, are covered with the ordinary Chinese pan and roll tiling and, where flat, with reinforced concrete. The staircase to the upper storey of the subsidiary building is of reinforced concrete. The buildings throughout are lit by electric light. All liabilities were discharged before the close of the year. 1914 Estimates, 1914 Sup. Vote, $ 2,500.00 | Total Estimates, $6,500.00 9,200.00 $11,700.00 1914 Expenditure.. 11,340.62 Expenditure to 31/12/14. 13,921.94 The reason for the large excess is that extensive alterations and additions were made after the date of the original estimate and it was also decided to proceed at once with certain portions of the scheme which it had been intended to allow to remain in abeyance. 125. Roads-General Works.--The following is a statement of the works executed under this heading except those of a trifling nature: (i.) Ashley Road---forming carriageways and foot-ways around K.I.L. 110, including the necessary kerbing, channelling and drainage, (completed), (ii) Constructing two reinforced concrete bridges over nullah in Portland Street, (completed), (iii) Kerbing and channelling, etc., portions of area in front of new Railway Terminus to form approach to new Star Ferry Wharf, (completed), (iv) Nathan Road-taking up and resetting kerbing and laying new channelling to west front of K.I.L. 571, (completed), $1,758 692 583 122 * Certain private streets laid out on K.I.L. 410 were surrendered to Government in March 1914. P 75
Baseline (Original)
- P 75 P.W.E. Kowloon, the old Inspector's room and Charge room, including extensions of same, into a Charge room, 24′ 0′′ × 15′ ("; and the addition of 3 bathrooms, a drying-room and a kitchen. In the case of the subsidiary building in the rear of the main building, an upper storey was added, containing two large. dormitories, 47′ 2′′ 12′ 3′′ and 46′ 4′′ × 14′ 0′′ for 8 Indian and 10 Chinese Constables respectively, besides bathrooms and a verandah, whilst, on the ground floor, a small bay containing the staircase to give access to the new upper floor was constructed. The walls throughout are of Canton red brick covered externally with rough-cast plaster. The internal surfaces of the walls of the main building are plastered whilst those of the subsidiary building are pointed and limewashed. The floors of the main building are of hardwood nailed to fillets let into cement concrete and those of the subsidiary building are of reinforced concrete. The roofs. where pitched, are covered with the ordinary Chinese pan and roll tiling and, where flat, with reinforced concrete. The staircase to the upper storey of the subsidiary building is of reinforced concrete. The buildings throughout are lit by electric light. All liabilities were discharged before the close of the year. 1914 Estimates, 1914 Sup. Vote, $ 2,500.00 | Total Estimates, $6,500.00 9,200.00 $11,700.00 1914 Expenditure.. 11.340.62 Expenditure to 31/12/14. 13.921.94 The reason of the large excess is that extensive alterations and additions were made after the late of the original estimate and it was also decided to proceed at once with certain portions of the scheme which it had been intended to allow to remain in abeyance. 125. Roads-tieneral. Works.--The following is a statement of the works executed under this heading except those of a trifling nature: (i.) Ashley Road---forming carriageways and foot- ways around K.I.L. 110, including the necessary kerbing, channelling and drainage, (completed), (ii) Constructing two reinforced concrete bridges over nullah in Portland Street, (completed), - (iii) Kerbing and channelling, etc., portions of area in front of new Railway Terminus to form approach to new Star Ferry Wharf, (coni- pleted), (iv) Nathan Road-taking up and resetting herbing and laying new channelling to west front of K.L.L. 571, (completed), $1,758* 692 583 122 * Certain private streets laid out on K.I.L. 410 were surrendered to Government in March 1914.
2026-05-06 09:06:31 · Baseline
View content

- P 75

P.W.E. Kowloon,

the old Inspector's room and Charge room, including extensions of same, into a Charge room, 24′ 0′′ × 15′ ("; and the addition of 3 bathrooms, a drying-room and a kitchen.

In the case of the subsidiary building in the rear of the main building, an upper storey was added, containing two large. dormitories, 47′ 2′′ 12′ 3′′ and 46′ 4′′ × 14′ 0′′ for 8 Indian and 10 Chinese Constables respectively, besides bathrooms and a verandah, whilst, on the ground floor, a small bay containing the staircase to give access to the new upper floor was constructed.

The walls throughout are of Canton red brick covered externally with rough-cast plaster. The internal surfaces of the walls of the main building are plastered whilst those of the subsidiary building are pointed and limewashed. The floors of the main building are of hardwood nailed to fillets let into cement concrete and those of the subsidiary building are of reinforced concrete. The roofs. where pitched, are covered with the ordinary Chinese pan and roll tiling and, where flat, with reinforced concrete. The staircase to the upper storey of the subsidiary building is of reinforced concrete.

The buildings throughout are lit by electric light.

All liabilities were discharged before the close of the year.

1914 Estimates, 1914 Sup. Vote,

$ 2,500.00 | Total Estimates,

$6,500.00

9,200.00

$11,700.00

1914 Expenditure..

11.340.62

Expenditure to

31/12/14.

13.921.94

The reason of the large excess is that extensive alterations and additions were made after the late of the original estimate and it was also decided to proceed at once with certain portions of the scheme which it had been intended to allow to remain in abeyance.

125. Roads-tieneral. Works.--The following is a statement of the works executed under this heading except those of a trifling

nature:

(i.) Ashley Road---forming carriageways and foot- ways around K.I.L. 110, including the necessary kerbing, channelling and drainage, (completed),

(ii) Constructing two reinforced concrete bridges over nullah in Portland Street, (completed), - (iii) Kerbing and channelling, etc., portions of area in front of new Railway Terminus to form approach to new Star Ferry Wharf, (coni- pleted),

(iv) Nathan Road-taking up and resetting herbing and laying new channelling to west front of K.L.L. 571, (completed),

$1,758*

692

583

122

* Certain private streets laid out on K.I.L. 410 were surrendered to Government

in March 1914.