P.W.E. Hongkong.
Area in Sy. Ft. 372.00
In rear of Nos. 1-8 Yeung Lok Lane, I.L. 2028,
No. 6 Pokfulam Road, I.L. 677 Section A, Sub-section 1,
69.00
No. 25A Eastern Street, I.L. 687, Section D.
87.00
Two houses on L.L. 1927, Wongneichong,
210.00
Nos. 13, 15 and 17 Western Street, I.L. 747 Section B, Sub-section 2,
199.50
No. 76 Main Street. Shaukiwan East, S.I.L. 64,
81.00
Nos. 54 and 56 Main Street, Shaukiwan East, S.I.L. 62 Section A,
174.00
(4.) Seurenging Lanes to be provided by owners when an opportunity occurs of gaining access to them from the adjoining streets.
Area in Sq. Ft.
In rear of No. 63 Queen's Road West, I.L. 1178,
65.30
Nos. 13 Square Street and 144 Hollywood Road, I.L. 255,
132.00
No. 85 Wing Lok Street, I.L. 1885,
82.00
No. 102 Wing Lok Street, I.L. 1832 Section A
45.75
No. 34 Wing Lok Street, I.L. 1868,
35.00
No. 105 Wing Lok Street, M.L. 135 R.P.,
43.60
No. 166 Wing Lok Street, M.L. 253 Section C,
90.00
Nos. 32 and 34 Main Street, Shaukiwan East, S.I.Ls 141 and 59,
No. 85 Jervois Street, I.L. 900 R.P..
147.00
90.30
118. Shaukiwan Water Works Extension.-These works were satisfactorily completed and were put into operation on the 28th May. A description of them will be found in last year's Report.
Total Estimates, ...$40,000.00
1914 Estimates,
1914 Sup. Vote,.....
$7,000.00
4,000.00
1914 Expenditure,...... 6,994.96
Expenditure to 31/12/14,............37,399.24
119. Additional Service Reservoir, &c., West Point.-The negotiations with the Military Authorities mentioned in last year's Report were concluded and resulted in the transfer to the Colonial Government of a large portion of the area occupied in connection with Elliott Battery. This alteration in the site necessitated a re-arrangement of the works as originally designed and consequently a Contract for the work was not let until the end of September. The scheme includes 6 Filter Beds, each provided with a pre-filter, of an average area of about 880 square yards, besides a service reservoir with a capacity of about 5 million gallons. The service reservoir will be divided by a cross-wall so as to admit of one com-
Page 465
Page 466
Do.
- P 69
P.W.E. Hongkong.
Area in Sy. Ft. 372.00
In rear of Nos. 1-8 Yeung Lok Lane, I.L. 2028,
No. 6 Pokfulam Road, I.L. 677 Section A, Sub-section 1,
69.00
Do.
No. 25A Eastern Street, I.L. 687, Section
D.
87.00
Do.
-
Two houses on LL. 1927, Wongnei- chong,
-
-
210.00
Do.
Nos. 13, 15 and 17 Western Street, I.L. 747 Section B, Sub-section 2,
199.50
Do.
No. 76 Main Street. Shaukiwan East,
S.I.L. 64,
81.00
-
Do.
Nos. 54 and 56 Main Street, Shaukiwan East, S.I.L. 62 Section A,
174.00
-
(4.)-Seurenging Lanes to be provided by owners when an opportunity occurs of gaining access to them from the adjoining streets.
Area in Sq. Ft.
In rear of No. 63 Queen's Road West, I.L. 1178,
65.30
Do.
Nos. 13 Square Street and 144 Holly- wood Road, I.L. 255,
-
132.00
Do.
No. 85 Wing Lok Street, 1.L. 1885,
82.00
Do.
-
No. 102 Wing Lok Street, 1.L. 1832 Section A
45.75
Do.
No. 34 Wing Lok Street, I.L. 1868,
35.00
Do.
No. 105 Wing Lok Street, M.L. 135
R.P.,
43.60
Do.
No. 166 Wing Lok Street, M.L. 253
Section C,
90.00
Do.
Do.
Nos. 32 and 34 Main Street, Shaukiwan East, S.LLs 141 and 59, No. 85 Jervois Street, I.L. 900 R.P..
-
147.00
90.30
118. Shaukiwan Water Works Extension.-These works were satisfactorily completed and were put into operation on the 28th May. A description of them will be found in last year's Report.
$3,000.00 Total Estimates, ...$40,000.00
1914 Estimates,
1914 Sup. Vote,.....
4,000.00
$7,000.00
1914 Expenditure,...... 6,994.96
Expenditure to
31/12/14,............37,399.24
119. Additional Service Reservoir, &c., West Point.-The ne- gotiations with the Military Authorities mentioned in last year's Report were concluded and resulted in the transfer to the Colonial Government of a large portion of the area occupied in connection with Elliott Battery. This alteration in the site necessitated a re-arrangement of the works as originally designed and consequent- ly a Contract for the work was not let until the end of September. The scheme includes 6 Filter Beds, each provided with a pre-filter, of an average area of about 880 square yards, besides a service re- servoir with a capacity of about 5 million gallons. The service reservoir will be divided by a cross-wall so as to admit of one com-