- P 53 -
A sum of $105.29 was recovered from the owner of No. 11 Morrison Street for the shoring up of a dangerous wall and was credited to this vote.
1911 Estimates, $35,000.00
1911 Supplementary Vote, 3,600.00 $38,600.00
1911 Expenditure, 36,850.14
109. Typhoon Refuge, Mongkoktsui.--Operations during the year were confined to quarrying or collecting from beaches and depositing pell-mell rubble and to dredging trenches for the rubble mounds which will enclose the reclamation to be constructed at Taikoktsui, south of Kowloon Marine Lot No. 32.
The latter work was begun on March 27th and completed by December 7th, being carried out by the Government grab dredger. The total quantity of material dredged, consisting of mud, sand and coral, amounted to 26,092 cubic yards (junk measurement).
The fleet of junks for the collection and conveyance of stone, which on the 1st of January numbered 10, was rapidly added to and by May numbered 85; whilst the quantity of stone deposited per month, which was for January 7,980 cubic yards (junk measurement), had increased by May to 27,076 cubic yards. By the end of October, the two-ton boulders forming the inner and outer toes of the rubble mound constituting the breakwater and the small stone hearting between the same had been deposited and by the end of the year the stone throughout the entire length of the breakwater stood at an average height of eight feet above the bottom of the dredged trench.
The total quantity of stone deposited during the year amounted to 259,636 cubic yards (junk and barge measurement) of which 252,883 cubic yards were deposited in the breakwater and 6,753 cubic yards in the south jetty and in the mounds to enclose the reclamation south of Kowloon Marine Lot 32.
1911 Estimates, $300,000.00 Total Estimates, $2,301,600.00
1911 Sup. Vote, 25,000.00 325,000.00
1911 Expenditure, 320,324.86
31/12/11, 626,934.16110. Reclamation opposite K.M.L.'s 29-31, Yaumati.-A contract for this work was let to Mr. Keng Tak Cheong on the 2nd December for the sum of $63,708.65. The reclamation will have an area of 394,350 square feet and a water frontage of 635 lineal feet. No payment was made to the Contractor before the close of the year. The only expenditure incurred during the year was for valuations in connection with claims made against the Government by the Marine Lot holders on account of alleged interference with their rights of access to the waters of the harbour. Under section 12 of "The Harbour of Refuge Ordinance, 1909" the lot-holders were required to forward their claims to Government and, failing an amicable settlement, provision was made for the reference of such claims to one of the Judges of the Supreme Court. As no settlement
- P 53 -
A sum of $105.29 was recovered from the owner of No. 11 Morrison Street for the shoring up of a dangerous wall and was credited to this vote.
1911 Estimates,
1911 Supplementary Vote,
1911 Expenditure,
$35,000.00
3,600.00
$38,600.00
36,850.14
109. Typhoon Refuge, Mongkoktsui.--Operations during the year were confined to quarrying or collecting from beaches and depositing pell-mell rubble and to dredging trenches for the rubble mounds which will enclose the reclamation to be constructed at Taikoktsui, south of Kowloon Marine Lot No. 32.
The latter work was begun on March 27th and completed by December 7th, being carried out by the Government grab dredger. The total quantity of material dredged, consisting of mud, sand and coral, amounted to 26,092 cubic yards (junk measurement).
The fleet of junks for the collection and conveyance of stone, which on the 1st of January numbered 10, was rapidly added to and by May numbered 85; whilst the quantity of stone deposited per month, which was for January 7,980 cubic yards (junk measurement), had increased by May to 27,076 cubic yards. By the end of October, the two-ton boulders forming the inner and outer toes of the rubble mound constituting the breakwater and the small stone hearting between the same had been deposited and by the end of the year the stone throughout the entire length of the breakwater stood at an average height of eight feet above the bottom of the dredged trench.
•
The total quantity of stone deposited during the year amounted to 259,636 cubic yards (junk and barge measurement) of which 252,883 cubic yards were deposited in the breakwater and 6,753 cubic yards in the south jetty and in the mounds to enclose the reclamation south of Kowloon Marine Lot 32.
1911 Estimates,...$300,000.00 Total Estimates, $2,301,600.00 1911 Sup. Vote,... 25,000.00 Expenditure to
325,000.00
1911 Expenditure, 320,324.86
|
31/12/11,
626,934.16
110. Reclamation opposite K.M.L.'s 29-31, Yaumati.-A con- tract for this work was let to Mr. Keng Tak Cheong on the 2nd. December for the sun of $63,708.65. The reclamation will have an area of 394,350 square feet and a water frontage of 635 lineal feet. No payment was made to the Contractor before the close of the year. The only expenditure incurred during the year was for valuations in connection with claims made against the Government by the Marine Lot holders on account of alleged interference with their rights of access to the waters of the harbour. Under section 12 of "The Harbour of Refuge Ordinance, 1909" the lot-holders were required to forward their claims to Government and, failing an amicable settlement, provision was made for the reference of such claims to one of the Judges of the Supreme Court. As no settlement