Item (xv.) In the sale conditions of I.L. 1896, it was stipulated that the 6" sewer crossing the corner of this lot should be diverted by Government into the scavenging lane at the side.

Items (xvi) & (xxiii). These items require no comment.

Item (xvii.) The area mentioned in this item had no storm water drains to take off the surface water from the streets that are partially formed and built on, the result being that, after heavy rainfalls, large pools of water were formed. Pipes, 15" & 12" diameter, were laid in Canton Road, and in Reclamation, Shanghai and Portland Streets.

Item (xviii.) Owing to the development of Shamshuipo, a drainage scheme was prepared and certain sections of sewers have been laid, where buildings are erected. The work done during the year was the construction of a length of 24" cement concrete culvert near N.K.I.L. 26, two lengths of 6" sewers for N.K.I.L.'s 17 & 21, a length of 6" temporary drain to divert the drainage from property on the foreshore, owing to the outlets being obstructed by the new reclamation, and a short length of nullah training 20 feet wide, with temporary and permanent lengths of 15" pipes for diverting the existing storm water and surface sullage drains from lanes and property on the foreshore obstructed by the reclamation of N.K.I.L.'s 46-50.

Item (xix.) The training of this length of nullah was required owing to the erosion of the side of the road running parallel to the railway.

Item (xx.) The diversion of the 18" pipe sewer was required on account of the building of a Fat-Boiling Factory on K.I.L. 1266.

Item (xxi.) This extension was required to take the drainage from buildings being erected on K.I.L. 574.

Item (xxii.) This extension was necessary to take the drainage from the Weaving Factory erected on K.I.L. 571.

104. Extensions of Lighting.-The following lamps were erected :--

CITY AND HILL DISTRICT.

Sampan Street, Spring Gardens Lane, 2 Mee Lun Lane Latrine, 2 Pound Lane Latrine, 2 Trough Closet under ramp to Government Civil Hospital, 1 Bonham Road, junction with Park Road, 1 Tai Loi Lane, 1* Corner of Catchick Street and Smithfield, 1*

* These lamps were charged to Advance Account "Private Streets Improvements".

† These lamps were charged to the Vote "Public Latrines and Urinals".

Page 48


Page 48

Edit History

2026-05-06 07:35:53 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
Page 48 Item (xv.) In the sale conditions of I.L. 1896, it was stipulated that the 6" sewer crossing the corner of this lot should be diverted by Government into the scavenging lane at the side. Items (xvi) & (xxiii). These items require no comment. Item (xvii.) The area mentioned in this item had no storm water drains to take off the surface water from the streets that are partially formed and built on, the result being that, after heavy rainfalls, large pools of water were formed. Pipes, 15" & 12" diameter, were laid in Canton Road, and in Reclamation, Shanghai and Portland Streets. Item (xviii.) Owing to the development of Shamshuipo, a drainage scheme was prepared and certain sections of sewers have been laid, where buildings are erected. The work done during the year was the construction of a length of 24" cement concrete culvert near N.K.I.L. 26, two lengths of 6" sewers for N.K.I.L.'s 17 & 21, a length of 6" temporary drain to divert the drainage from property on the foreshore, owing to the outlets being obstructed by the new reclamation, and a short length of nullah training 20 feet wide, with temporary and permanent lengths of 15" pipes for diverting the existing storm water and surface sullage drains from lanes and property on the foreshore obstructed by the reclamation of N.K.I.L.'s 46-50. Item (xix.) The training of this length of nullah was required owing to the erosion of the side of the road running parallel to the railway. Item (xx.) The diversion of the 18" pipe sewer was required on account of the building of a Fat-Boiling Factory on K.I.L. 1266. Item (xxi.) This extension was required to take the drainage from buildings being erected on K.I.L. 574. Item (xxii.) This extension was necessary to take the drainage from the Weaving Factory erected on K.I.L. 571. 104. Extensions of Lighting.-The following lamps were erected :-- CITY AND HILL DISTRICT. Sampan Street, Spring Gardens Lane, 2 Mee Lun Lane Latrine, 2 Pound Lane Latrine, 2 Trough Closet under ramp to Government Civil Hospital, 1 Bonham Road, junction with Park Road, 1 Tai Loi Lane, 1* Corner of Catchick Street and Smithfield, 1* * These lamps were charged to Advance Account "Private Streets Improvements". These lamps were charged to the Vote "Public Latrines and Urinals". Page 48 Page 48
Baseline (Original)
! P 48 Item (xv.) In the sale conditions of I.L. 1896, it was stipulated that the 6" sewer crossing the corner of this lot should be diverted by Government into the scavenging lane at the side. Items (xvi) & (xxiii). These items require no comment. Item (xvii.) The area mentioned in this item had no storm water drains to take off the surface water from the streets that are partially formed and built on, the result being that, after heavy rainfalls, large pools of water were formed. Pipes, 15" & 12" diameter, were laid in Canton Road, and in Reclamation, Shanghai and Portland Streets. Item (xviii.) Owing to the development of Shamshuipo, a drainage scheme was prepared and certain sections of sewers have been laid, where buildings are erected. The work done during the year was the construction of a length of 24" cement concrete culvert near N.K.I.L. 26, two lengths of 6" sewers for N.K.I.L.'s 17 & 21, a length of 6" temporary drain to divert the drainage from property on the foreshore, owing to the outlets being obstructed by the new reclamation, and a short length of nullah training 20 feet wide, with temporary and permanent lengths of 15" pipes for diverting the existing storm water and surface sullage drains from lanes and pro- perty on the foreshore obstructed by the reclamation of N.K.I.L.'s 46-50. Item (xix.) The training of this length of nullah was required owing to the erosion of the side of the road running parallel to the railway, Item (xx.) The diversion of the 18" pipe sewer was required on account of the building of a Fat-Boiling Factory on K.I.L. 1266. Item (xxi.) This extension was required to take the drainage from buildings being erected on K.IL. 574. Item (xxii.) This extension was necessary to take the drainage from the Weaving Factory erected on K.I.L. 571. 104. Extensions of Lighting.-The following lamps were erected :-- CITY AND HILL DISTRICT. Sampan Street, Spring Gardens Lane, Mee Lun Lane Latrine, Pound Lane Latrine, - Trough Closet under ramp to Government Čivil Hospital, - Bonham Road, junction with Park Road, Tai Loi Lane, Corner of Catchick Street and Smithfield, 2* 2+ 2+ 1 - 1* 1 * These lamps were charged to Advance Account "Private Streets Improve- ments " These lamps were charged to the Vote "Public Latrines and Urinals".
2026-05-06 07:35:53 · Baseline
View content

!

P 48

Item (xv.) In the sale conditions of I.L. 1896, it was stipulated that the 6" sewer crossing the corner of this lot should be diverted by Government into the scavenging lane at the side.

Items (xvi) & (xxiii). These items require no comment.

Item (xvii.) The area mentioned in this item had no storm water drains to take off the surface water from the streets that are partially formed and built on, the result being that, after heavy rainfalls, large pools of water were formed. Pipes, 15" & 12" diameter, were laid in Canton Road, and in Reclamation, Shanghai and Portland Streets.

Item (xviii.) Owing to the development of Shamshuipo, a drainage scheme was prepared and certain sections of sewers have been laid, where buildings are erected. The work done during the year was the construction of a length of 24" cement concrete culvert near N.K.I.L. 26, two lengths of 6" sewers for N.K.I.L.'s 17 & 21, a length of 6" temporary drain to divert the drainage from property on the foreshore, owing to the outlets being obstructed by the new reclamation, and a short length of nullah training 20 feet wide, with temporary and permanent lengths of 15" pipes for diverting the existing storm water and surface sullage drains from lanes and pro- perty on the foreshore obstructed by the reclamation of N.K.I.L.'s 46-50.

Item (xix.) The training of this length of nullah was required owing to the erosion of the side of the road running parallel to the railway,

Item (xx.) The diversion of the 18" pipe sewer was required on account of the building of a Fat-Boiling Factory on K.I.L. 1266.

Item (xxi.) This extension was required to take the drainage from buildings being erected on K.IL. 574.

Item (xxii.) This extension was necessary to take the drainage from the Weaving Factory erected on K.I.L. 571.

104. Extensions of Lighting.-The following lamps were erected :--

CITY AND HILL DISTRICT.

Sampan Street, Spring Gardens Lane,

Mee Lun Lane Latrine,

Pound Lane Latrine,

-

Trough Closet under ramp to Government

Čivil Hospital, -

Bonham Road, junction with Park Road,

Tai Loi Lane,

Corner of Catchick Street and Smithfield,

2*

2+

2+

1

-

1* 1

* These lamps were charged to Advance Account "Private Streets Improve-

ments "

† These lamps were charged to the Vote "Public Latrines and Urinals".