Signal Hill, Kowloon Point--Providing clock movement for revolving light and gear for lighting, &c.,

Green Island--External repairs, painting, colour-washing and limewashing throughout,

Cape Collinson--General repairs, painting, colour-washing and limewashing throughout,

Cap Sui Mun--

Do. do.,

$452

-

403

389

156

45. Maintenance of Roads and Bridges in City.--The road surfaces were maintained generally in a satisfactory condition. The surfacing of macadamized roads was considerably damaged by the continuous rains in May and by the typhoons of the 27th July and the 5th and 6th August,

That portion of Ice House Street between Queen's Road and Des Voeux Road Central was paved with 6" wood blocks laid on cement concrete 4" thick, the total area being 760 square yards. Half of the street was laid with camphorwood and the remainder with Jarrah blocks.

Victoria Road was macadamized up to the City boundary and for some distance beyond as mentioned in the next paragraph.

Wardley Street, adjoining the City Hall, that portion of Queen's Road between the City Hall and Ice House Street and that portion of Kennedy Road between Garden Road and the Union Church were laid with tarred macadam,

46. Maintenance of Roads and Bridges outside City.--The road surfaces generally were maintained in a satisfactory manner,

That portion of Victoria Road from the City boundary to the approach road to Mount Davis Battery was macadamized, the Military Authorities contributing $750 towards the cost.

The tar macadam surfacing of Barker Road was extended for a distance of about 1,000 feet.

47. Maintenance of Roads and Bridges in Kowloon.--The roads were maintained in good condition.

On the Hunghom to Kowloon City Road macadam was substituted for decomposed granite for a length of 200 yards; on the Yaumati to Kowloon City Road for a length of 800 yards and on Nathan Road for a length of 500 yards.

Argyle Street from Shanghai Street to Kowloon City Road was macadamized and also the branch road from near the Tai Shek Ku Temple to Mataukok Slaughter House.

Page 19


should be rewritten to

Page 19

Signal Hill, Kowloon Point--Providing clock movement for revolving light and gear for lighting, &c.,

Green Island--External repairs, painting, colour-washing and limewashing throughout,

Cape Collinson--General repairs, painting, colour-washing and limewashing throughout,

Cap Sui Mun--Do. do.,

$452

-

403

389

156

45. Maintenance of Roads and Bridges in City.--The road surfaces were maintained generally in a satisfactory condition. The surfacing of macadamized roads was considerably damaged by the continuous rains in May and by the typhoons of the 27th July and the 5th and 6th August, That portion of Ice House Street between Queen's Road and Des Voeux Road Central was paved with 6" wood blocks laid on cement concrete 4" thick, the total area being 760 square yards. Half of the street was laid with camphorwood and the remainder with Jarrah blocks.

Victoria Road was macadamized up to the City boundary and for some distance beyond as mentioned in the next paragraph.

Wardley Street, adjoining the City Hall, that portion of Queen's Road between the City Hall and Ice House Street and that portion of Kennedy Road between Garden Road and the Union Church were laid with tarred macadam,

46. Maintenance of Roads and Bridges outside City.--The road surfaces generally were maintained in a satisfactory manner, That portion of Victoria Road from the City boundary to the approach road to Mount Davis Battery was macadamized, the Military Authorities contributing $750 towards the cost.

The tar macadam surfacing of Barker Road was extended for a distance of about 1,000 feet.

47. Maintenance of Roads and Bridges in Kowloon.--The roads were maintained in good condition.

On the Hunghom to Kowloon City Road macadam was substituted for decomposed granite for a length of 200 yards; on the Yaumati to Kowloon City Road for a length of 800 yards and on Nathan Road for a length of 500 yards.

Argyle Street from Shanghai Street to Kowloon City Road was macadamized and also the branch road from near the Tai Shek Ku Temple to Mataukok Slaughter House.

Page 19

The final output is

Page 19

Signal Hill, Kowloon Point--Providing clock movement for revolving light and gear for lighting, &c.,

Green Island--External repairs, painting, colour-washing and limewashing throughout,

Cape Collinson--General repairs, painting, colour-washing and limewashing throughout,

Cap Sui Mun--Do. do., $452

- 403

389

156

45. Maintenance of Roads and Bridges in City.--The road surfaces were maintained generally in a satisfactory condition. The surfacing of macadamized roads was considerably damaged by the continuous rains in May and by the typhoons of the 27th July and the 5th and 6th August, That portion of Ice House Street between Queen's Road and Des Voeux Road Central was paved with 6" wood blocks laid on cement concrete 4" thick, the total area being 760 square yards. Half of the street was laid with camphorwood and the remainder with Jarrah blocks.

Victoria Road was macadamized up to the City boundary and for some distance beyond as mentioned in the next paragraph.

Wardley Street, adjoining the City Hall, that portion of Queen's Road between the City Hall and Ice House Street and that portion of Kennedy Road between Garden Road and the Union Church were laid with tarred macadam,

46. Maintenance of Roads and Bridges outside City.--The road surfaces generally were maintained in a satisfactory manner, That portion of Victoria Road from the City boundary to the approach road to Mount Davis Battery was macadamized, the Military Authorities contributing $750 towards the cost.

The tar macadam surfacing of Barker Road was extended for a distance of about 1,000 feet.

47. Maintenance of Roads and Bridges in Kowloon.--The roads were maintained in good condition.

On the Hunghom to Kowloon City Road macadam was substituted for decomposed granite for a length of 200 yards; on the Yaumati to Kowloon City Road for a length of 800 yards and on Nathan Road for a length of 500 yards.

Argyle Street from Shanghai Street to Kowloon City Road was macadamized and also the branch road from near the Tai Shek Ku Temple to Mataukok Slaughter House.

Page 19

Edit History

2026-05-06 07:31:46 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
Page 19 Signal Hill, Kowloon Point--Providing clock movement for revolving light and gear for lighting, &c., Green Island--External repairs, painting, colour-washing and limewashing throughout, Cape Collinson--General repairs, painting, colour-washing and limewashing throughout, Cap Sui Mun-- Do. do., $452 - 403 389 156 45. Maintenance of Roads and Bridges in City.--The road surfaces were maintained generally in a satisfactory condition. The surfacing of macadamized roads was considerably damaged by the continuous rains in May and by the typhoons of the 27th July and the 5th and 6th August, That portion of Ice House Street between Queen's Road and Des Voeux Road Central was paved with 6" wood blocks laid on cement concrete 4" thick, the total area being 760 square yards. Half of the street was laid with camphorwood and the remainder with Jarrah blocks. Victoria Road was macadamized up to the City boundary and for some distance beyond as mentioned in the next paragraph. Wardley Street, adjoining the City Hall, that portion of Queen's Road between the City Hall and Ice House Street and that portion of Kennedy Road between Garden Road and the Union Church were laid with tarred macadam, 46. Maintenance of Roads and Bridges outside City.--The road surfaces generally were maintained in a satisfactory manner, That portion of Victoria Road from the City boundary to the approach road to Mount Davis Battery was macadamized, the Military Authorities contributing $750 towards the cost. The tar macadam surfacing of Barker Road was extended for a distance of about 1,000 feet. 47. Maintenance of Roads and Bridges in Kowloon.--The roads were maintained in good condition. On the Hunghom to Kowloon City Road macadam was substituted for decomposed granite for a length of 200 yards; on the Yaumati to Kowloon City Road for a length of 800 yards and on Nathan Road for a length of 500 yards. Argyle Street from Shanghai Street to Kowloon City Road was macadamized and also the branch road from near the Tai Shek Ku Temple to Mataukok Slaughter House. Page 19 should be rewritten to Page 19 Signal Hill, Kowloon Point--Providing clock movement for revolving light and gear for lighting, &c., Green Island--External repairs, painting, colour-washing and limewashing throughout, Cape Collinson--General repairs, painting, colour-washing and limewashing throughout, Cap Sui Mun--Do. do., $452 - 403 389 156 45. Maintenance of Roads and Bridges in City.--The road surfaces were maintained generally in a satisfactory condition. The surfacing of macadamized roads was considerably damaged by the continuous rains in May and by the typhoons of the 27th July and the 5th and 6th August, That portion of Ice House Street between Queen's Road and Des Voeux Road Central was paved with 6" wood blocks laid on cement concrete 4" thick, the total area being 760 square yards. Half of the street was laid with camphorwood and the remainder with Jarrah blocks. Victoria Road was macadamized up to the City boundary and for some distance beyond as mentioned in the next paragraph. Wardley Street, adjoining the City Hall, that portion of Queen's Road between the City Hall and Ice House Street and that portion of Kennedy Road between Garden Road and the Union Church were laid with tarred macadam, 46. Maintenance of Roads and Bridges outside City.--The road surfaces generally were maintained in a satisfactory manner, That portion of Victoria Road from the City boundary to the approach road to Mount Davis Battery was macadamized, the Military Authorities contributing $750 towards the cost. The tar macadam surfacing of Barker Road was extended for a distance of about 1,000 feet. 47. Maintenance of Roads and Bridges in Kowloon.--The roads were maintained in good condition. On the Hunghom to Kowloon City Road macadam was substituted for decomposed granite for a length of 200 yards; on the Yaumati to Kowloon City Road for a length of 800 yards and on Nathan Road for a length of 500 yards. Argyle Street from Shanghai Street to Kowloon City Road was macadamized and also the branch road from near the Tai Shek Ku Temple to Mataukok Slaughter House. Page 19 The final output is Page 19 Signal Hill, Kowloon Point--Providing clock movement for revolving light and gear for lighting, &c., Green Island--External repairs, painting, colour-washing and limewashing throughout, Cape Collinson--General repairs, painting, colour-washing and limewashing throughout, Cap Sui Mun--Do. do., $452 - 403 389 156 45. Maintenance of Roads and Bridges in City.--The road surfaces were maintained generally in a satisfactory condition. The surfacing of macadamized roads was considerably damaged by the continuous rains in May and by the typhoons of the 27th July and the 5th and 6th August, That portion of Ice House Street between Queen's Road and Des Voeux Road Central was paved with 6" wood blocks laid on cement concrete 4" thick, the total area being 760 square yards. Half of the street was laid with camphorwood and the remainder with Jarrah blocks. Victoria Road was macadamized up to the City boundary and for some distance beyond as mentioned in the next paragraph. Wardley Street, adjoining the City Hall, that portion of Queen's Road between the City Hall and Ice House Street and that portion of Kennedy Road between Garden Road and the Union Church were laid with tarred macadam, 46. Maintenance of Roads and Bridges outside City.--The road surfaces generally were maintained in a satisfactory manner, That portion of Victoria Road from the City boundary to the approach road to Mount Davis Battery was macadamized, the Military Authorities contributing $750 towards the cost. The tar macadam surfacing of Barker Road was extended for a distance of about 1,000 feet. 47. Maintenance of Roads and Bridges in Kowloon.--The roads were maintained in good condition. On the Hunghom to Kowloon City Road macadam was substituted for decomposed granite for a length of 200 yards; on the Yaumati to Kowloon City Road for a length of 800 yards and on Nathan Road for a length of 500 yards. Argyle Street from Shanghai Street to Kowloon City Road was macadamized and also the branch road from near the Tai Shek Ku Temple to Mataukok Slaughter House. Page 19
Baseline (Original)
- P 19 Signal Hill, Kowloon Point--Providing clock inovement for revolving light and gear for lighting, &c., Green Island-External repairs, painting, colour- washing and limewashing throughout, Cape Collinson-General repairs, painting, colour- washing and limewashing throughout, Cap Sui Mun-- Do.. do., $452 - 403 389 156 45. Maintenance of Roads and Bridges in City.-The_road surfaces were maintained generally in a satisfactory condition. The surfacing of macadamized roads was considerably damaged by the continuous rains in May and by the typhoons of the 27th July and the 5th and 6th August, That portion of Ice House Street between Queen's Road and Des Voeux Road Central was paved with 6" wood blocks laid on cement concrete 4" thick, the total area being 760 square yards. Half of the street was laid with camphorwood and the remainder with Jarrah blocks. Victoria Road was macadamized up to the City boundary and for some distance beyond as mentioned in the next paragraph. Wardley Street, adjoining the City Hall, that portion of Queen's Road between the City Hall and Ice House Street and that portion of Kennedy Road between Garden Road and the Union Church were laid with tarred macadam, 46. Maintenance of Roads and Bridges outside City.-The road surfaces generally were maintained in a satisfactory manner, That portion of Victoria Road from the City boundary to the approach road to Mount Davis Battery was macadamized, the Military Authorities contributing $750 towards the cost. The tar macadam surfacing of Barker Road was extended for a distance of about 1,000 feet. 47. Maintenance of Roads and Bridges in Kowloon.―The roads were maintained in good condition. On the Hunghom to Kowloon City Road macadam was substituted for decomposed granite for a length of 200 yards; on the Yaumati to Kowloon City Road for a length of 800 yards and on Nathan Road for a length of 500 yards. Argyle Street from Shanghai Street to Kowloon City Road was macadamized and also the branch road from near the Tai Shek Ku Temple to Mataukok Slaughter House.
2026-05-06 07:31:46 · Baseline
View content

- P 19

Signal Hill, Kowloon Point--Providing clock inovement for revolving light and gear for lighting, &c.,

Green Island-External repairs, painting, colour-

washing and limewashing throughout,

Cape Collinson-General repairs, painting, colour- washing and limewashing throughout,

Cap Sui Mun--

Do..

do.,

$452

-

403

389

156

45. Maintenance of Roads and Bridges in City.-The_road surfaces were maintained generally in a satisfactory condition. The surfacing of macadamized roads was considerably damaged by the continuous rains in May and by the typhoons of the 27th July and the 5th and 6th August,

That portion of Ice House Street between Queen's Road and Des Voeux Road Central was paved with 6" wood blocks laid on cement concrete 4" thick, the total area being 760 square yards. Half of the street was laid with camphorwood and the remainder with Jarrah blocks.

Victoria Road was macadamized up to the City boundary and for some distance beyond as mentioned in the next paragraph.

Wardley Street, adjoining the City Hall, that portion of Queen's Road between the City Hall and Ice House Street and that portion of Kennedy Road between Garden Road and the Union Church were laid with tarred macadam,

46. Maintenance of Roads and Bridges outside City.-The road surfaces generally were maintained in a satisfactory manner,

That portion of Victoria Road from the City boundary to the approach road to Mount Davis Battery was macadamized, the Military Authorities contributing $750 towards the cost.

The tar macadam surfacing of Barker Road was extended for a distance of about 1,000 feet.

47. Maintenance of Roads and Bridges in Kowloon.―The roads were maintained in good condition.

On the Hunghom to Kowloon City Road macadam was substituted for decomposed granite for a length of 200 yards; on the Yaumati to Kowloon City Road for a length of 800 yards and on Nathan Road for a length of 500 yards.

Argyle Street from Shanghai Street to Kowloon City Road was macadamized and also the branch road from near the Tai Shek Ku Temple to Mataukok Slaughter House.