56. Maintenance of Praya Walls and Piers.-The following is a statement of the principal items of expenditure under this vote:

Kennedy Town-Making good rubble pitching at west end of reclamation- General repairs.. $1,273

Taipo, Pier at Island-Reconstruction 822

Blake Pier-Painting, including small repairs 789

Kennedy Town Pier-General repairs..... 608

Queen's Statue Wharf-General repairs....................... 403

Aplichau Sea-wall-General repairs.... 247

Water Police Pier, Kowloon Point-General repairs....... 233

Kowloon City and Green Island Piers-General repairs.... 186

Harbour Office Pier-General repairs 159

Lai Chi Kok Pier-General repairs... 128

57. Maintenance of Public Cemetery.-Several of the unsur-faced footways were surfaced and channelled and a new terrace was formed in the western portion of the Cemetery.

58. Laying out Chinese Cemeteries and trenching for burials.

59. Exhumation of remains in Cemeteries. An account of the work carried out under these headings will be found in paragraph 36 of this Report.

60. Maintenance of Public Recreation Grounds. — The various grounds were maintained in good order. The area of Crown land on the east side of Tai Hang Nullah was raised considerably to bring it above flood level. The expenditure on this work, including turfing and fencing, amounted to $1,763.67. A fence was erected between the Polo Ground and the ground allotted to the Chinese Recreation Club at a cost of $161.13.

61. Dredging Foreshores -The dredger was employed for a considerable time in excavating a trench for the wall and pitched slope to enclose the reclamation at the north end of the Typhoon Refuge, Mongkoktsui. In all, 25,039 cubic yards of material were dredged at a cost of $5,734.12 which amount was debited to the Harbour of Refuge vote. The following is a statement of the other work done by the dredger during the year:

Causeway Bay6,981Cubic Yards. Storm water outfalls...4,161 Wing Lok Street Wharf11 Hongkong and Kowloon Wharf and Godown Co.'s Wharf at Western Street....1,598 Kowloon Point .....549 Police Basin, Kowloon Point1,854 19 North Point32419 Total.........15,606

Page 22

Edit History

2026-05-06 05:55:39 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
Page 22 56. Maintenance of Praya Walls and Piers.-The following is a statement of the principal items of expenditure under this vote: Kennedy Town-Making good rubble pitching at west end of reclamation- General repairs.. $1,273 Taipo, Pier at Island-Reconstruction 822 Blake Pier-Painting, including small repairs 789 Kennedy Town Pier-General repairs..... 608 Queen's Statue Wharf-General repairs....................... 403 Aplichau Sea-wall-General repairs.... 247 Water Police Pier, Kowloon Point-General repairs....... 233 Kowloon City and Green Island Piers-General repairs.... 186 Harbour Office Pier-General repairs 159 Lai Chi Kok Pier-General repairs... 128 57. Maintenance of Public Cemetery.-Several of the unsur-faced footways were surfaced and channelled and a new terrace was formed in the western portion of the Cemetery. 58. Laying out Chinese Cemeteries and trenching for burials. 59. Exhumation of remains in Cemeteries. An account of the work carried out under these headings will be found in paragraph 36 of this Report. 60. Maintenance of Public Recreation Grounds. The various grounds were maintained in good order. The area of Crown land on the east side of Tai Hang Nullah was raised considerably to bring it above flood level. The expenditure on this work, including turfing and fencing, amounted to $1,763.67. A fence was erected between the Polo Ground and the ground allotted to the Chinese Recreation Club at a cost of $161.13. 61. Dredging Foreshores -The dredger was employed for a considerable time in excavating a trench for the wall and pitched slope to enclose the reclamation at the north end of the Typhoon Refuge, Mongkoktsui. In all, 25,039 cubic yards of material were dredged at a cost of $5,734.12 which amount was debited to the Harbour of Refuge vote. The following is a statement of the other work done by the dredger during the year: Causeway Bay6,981Cubic Yards. Storm water outfalls...4,161 Wing Lok Street Wharf11 Hongkong and Kowloon Wharf and Godown Co.'s Wharf at Western Street....1,598 Kowloon Point .....549 Police Basin, Kowloon Point1,854 19 North Point32419 Total.........15,606 Page 22
Baseline (Original)
- P 22 56. Maintenance of Praya Walls and Piers.-The following is a statement of the principal items of expenditure under this vote:--- Kennedy Town-Making good rubble pitching at west end of reclamation- General repairs.. $1,273 Taipo, Pier at Island-Reconstruction 822 Blake Pier-Painting, including small repairs Kennedy Town Pier-General repairs..... 789 .... 608 Queen's Statue Wharf-General `repairs....................... Aplichau Sea-wall-General repairs.... 403 247 Water Police Pier, Kowloon Point-General repairs....... 233 Kowloon City and Green Island Piers-General repairs.... 186 Harbour Office Pier-General repairs 159 128 Lai Chi Kok Pier-General repairs... 57. Maintenance of Public Cemetery.-Several of the unsur- faced footways were surfaced and channelled and a new terrace was formed in the western portion of the Cemetery. 58. Laying out Chinese Cemeteries and trenching for burials. · An account of the 59. Exhumation of remains in Cemeteries. work carried out under these headings will be found in paragraph 36 of this Report. 60. Maintenance of Public Recreation Grounds. The various grounds were maintained in good order. The area of Crown land on the east side of Tai Hang Nullah was raised considerably to bring it above flood level. The expenditure on this work, including turfing and fencing, amounted to $1,763.67. A fence was erected between the Polo Ground and the ground allotted to the Chinese Recreation Club at a cost of $161.13. 61. Dredging Foreshores -The dredger was employed for a considerable time in excavating a trench for the wall and pitched slope to enclose the reclamation at the north end of the Typhoon, Refuge, Mongkoktsui. In all, 25,039 cubic yards of material were dredged at a cost of $5,734.12 which amount was debited to the Harbour of Refuge vote. The following is a statement of the other work done by the dredger during the year: - Causeway Bay Storm water outfalls... Wing Lok Street Wharf Hongkong and Kowloon Wharf and Godown Co.'s Wharf at Wes- 6,981 Cubic Yards. 4,161 串唱 11 1,598 tern Street.... Kowloon Point ..... Police Basin, Kowloon Point 549 1,854 " 19 139 ་་ "" North Point 324 19 Total......... 15,606 15 A ""
2026-05-06 05:55:39 · Baseline
View content

- P 22

56. Maintenance of Praya Walls and Piers.-The following is a statement of the principal items of expenditure under this vote:---

Kennedy Town-Making good rubble pitching at

west end of reclamation- General repairs.. $1,273

Taipo, Pier at Island-Reconstruction

822

Blake Pier-Painting, including small repairs Kennedy Town Pier-General repairs.....

789

....

608

Queen's Statue Wharf-General `repairs....................... Aplichau Sea-wall-General repairs....

403

247

Water Police Pier, Kowloon Point-General

repairs.......

233

Kowloon City and Green Island Piers-General

repairs....

186

Harbour Office Pier-General repairs

159

128

Lai Chi Kok Pier-General repairs...

57. Maintenance of Public Cemetery.-Several of the unsur- faced footways were surfaced and channelled and a new terrace was formed in the western portion of the Cemetery.

58. Laying out Chinese Cemeteries and trenching for burials.

· An account of the

59. Exhumation of remains in Cemeteries. work carried out under these headings will be found in paragraph 36 of this Report.

60. Maintenance of Public Recreation Grounds. — The various grounds were maintained in good order. The area of Crown land on the east side of Tai Hang Nullah was raised considerably to bring it above flood level. The expenditure on this work, including turfing and fencing, amounted to $1,763.67. A fence was erected between the Polo Ground and the ground allotted to the Chinese Recreation Club at a cost of $161.13.

61. Dredging Foreshores -The dredger was employed for a considerable time in excavating a trench for the wall and pitched slope to enclose the reclamation at the north end of the Typhoon, Refuge, Mongkoktsui. In all, 25,039 cubic yards of material were dredged at a cost of $5,734.12 which amount was debited to the Harbour of Refuge vote. The following is a statement of the other work done by the dredger during the year: -

Causeway Bay

Storm water outfalls...

Wing Lok Street Wharf

Hongkong and Kowloon Wharf and

Godown Co.'s Wharf at Wes-

6,981 Cubic Yards.

4,161

串唱

11

1,598

tern Street....

Kowloon Point .....

Police Basin, Kowloon Point

549

1,854

"

19

139

་་

""

North Point

324 19

Total.........

15,606