(xiii) Extension of storm water drain in yard adjoining Watkins' Dispensary (completed),...

(xiv) Reconstruction of gullies in Douglas Lane (completed), Cost of work, $153.94 Contribution by owners, $153.94

(xv) Diversion of sewer from I.L. 1896, Shin Hing Street (completed),

(xvi) Drain connections and other small items (completed),.

KOWLOON.

(xvii) Laying storm water drains in area west of Nathan Road and extending from Waterloo Road to Soy Street, Mongkoktsui, (completed),..

(xviii) Drainage works at Shamshuipo, (not completed),...... $164

(xix) Training a short length of nullah in Waterloo Road north of No. 4 Railway Bridge (length 380 feet) (completed), 3,604

(xx) Diversion of sewer near Slaughter Houses, Mataukok, (completed), 703

(xxi) Extension of sewer in Mody Road to K.I.L. 574 (completed),.. 569

(xxii) Extension of sewer in Saigon Street (completed),... 549

(xxiii) Drain connections and other small items, (completed), 696

1911 Estimates, $40,000.00 1911 Expenditure, $38,086.51

Item (i) This item was described in last year's Report (vide (ii)) and is now completed.

Item (ii) This work was undertaken to intercept the drainage from various houses situated within the watershed of the Aberdeen Valley. Only the first section of the work, extending from near R.B.L. 50 to R.B.L's 90, 120 & 127, was undertaken during the year. It consisted of the laying of 6" pipes along Craigmin Road and 4" pipes for the branches to lots.

Item (iii) This work was required to take the drainage from new houses erected on I.L. 1711. It consisted of the laying of a 6" pipe along the pathway to the west of I.L's 1509 & 1570 and the construction of an inspection culvert underneath the Bowen Road Conduit.

Edit History

2026-05-06 03:45:16 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
Page 46 (xiii) Extension of storm water drain in yard adjoining Watkins' Dispensary (completed),... (xiv) Reconstruction of gullies in Douglas Lane (completed), Cost of work, $153.94 Contribution by owners, $153.94 (xv) Diversion of sewer from I.L. 1896, Shin Hing Street (completed), (xvi) Drain connections and other small items (completed),. KOWLOON. (xvii) Laying storm water drains in area west of Nathan Road and extending from Waterloo Road to Soy Street, Mongkoktsui, (completed),.. (xviii) Drainage works at Shamshuipo, (not completed),...... $164 (xix) Training a short length of nullah in Waterloo Road north of No. 4 Railway Bridge (length 380 feet) (completed), 3,604 (xx) Diversion of sewer near Slaughter Houses, Mataukok, (completed), 703 (xxi) Extension of sewer in Mody Road to K.I.L. 574 (completed),.. 569 (xxii) Extension of sewer in Saigon Street (completed),... 549 (xxiii) Drain connections and other small items, (completed), 696 1911 Estimates, $40,000.00 1911 Expenditure, $38,086.51 Item (i) This item was described in last year's Report (vide (ii)) and is now completed. Item (ii) This work was undertaken to intercept the drainage from various houses situated within the watershed of the Aberdeen Valley. Only the first section of the work, extending from near R.B.L. 50 to R.B.L's 90, 120 & 127, was undertaken during the year. It consisted of the laying of 6" pipes along Craigmin Road and 4" pipes for the branches to lots. Item (iii) This work was required to take the drainage from new houses erected on I.L. 1711. It consisted of the laying of a 6" pipe along the pathway to the west of I.L's 1509 & 1570 and the construction of an inspection culvert underneath the Bowen Road Conduit.
Baseline (Original)
- P 46 (xiii) Extension of storm water drain in yard adjoining Watkins' Dispensary (com- pleted),... (xiv.) Reconstruction of gullies in Douglas Lane (completed), Cost of work, $153.94 Contribution by owners, $153.94 (xv.) Diversion of sewer from I.L. 1896, Shin Hing Street (completed), (xvi.) Drain connections and other small items (completed),. KOWLOON. (xvii.) Laying storm water drains in area west of Nathan Road and extending from Waterloo Road to Soy Street, Mong- koktsui, (completed),.. (xviii.) Drainage works at Shamshuipo, (not com- pleted),...... $ 164 146 2,979 10,891 1,688 (xix.) Training a short length of nullah in Water- loo Road north of No. 4 Railway Bridge (length 380 feet) (completed), 3,604 (xx.) Diversion of sewer near Slaughter Houses, Mataukok, (completed), 703 (xxi.) Extension of sewer in Mody Road to K.I.L. 574 (completed),.. 569 (xxii.) Extension of sewer in Saigon Street (com- pleted),... 549 (xxiii.) Drain connections and other small items, (completed), 1911 Estimates, 1911 Expenditure,. 696 $40,000 00 38,086.51 Item (i.) This item was described in last year's Report (ride (ii) ) and is now completed. Item (ii.) This work was undertaken to intercept the drainage from various houses situated within the watershed of the Aberdeen Valley. Only the first section of the work, extending from near R.B.L. 50 to R.B.L's 90, 120 & 127, was undertaken during the year. It consisted of the laying of 6" pipes along Craigmin Road and 4" pipes for the branches to lots. Item (iii.) This work was required to take the drainage from new houses erected on IL. 1711. It consisted of the laying of a 6" pipe along the pathway to the west of I.L's 1509 & 1570 and the construction of an inspection culvert underneath the Bowen Road Conduit.
2026-05-06 03:45:16 · Baseline
View content

- P 46

(xiii) Extension of storm water drain in yard adjoining Watkins' Dispensary (com- pleted),...

(xiv.) Reconstruction of gullies in Douglas Lane (completed), Cost of work, $153.94 Contribution by owners,

$153.94

(xv.) Diversion of sewer from I.L. 1896, Shin

Hing Street (completed),

(xvi.) Drain connections and other small items

(completed),.

KOWLOON.

(xvii.) Laying storm water drains in area west of Nathan Road and extending from Waterloo Road to Soy Street, Mong- koktsui, (completed),..

(xviii.) Drainage works at Shamshuipo, (not com-

pleted),......

$ 164

146

2,979

10,891

1,688

(xix.) Training a short length of nullah in Water- loo Road north of No. 4 Railway Bridge (length 380 feet) (completed), 3,604

(xx.) Diversion of sewer near Slaughter Houses,

Mataukok, (completed),

703

(xxi.) Extension of sewer in Mody Road to K.I.L.

574 (completed),..

569

(xxii.) Extension of sewer in Saigon Street (com-

pleted),...

549

(xxiii.) Drain connections and other small items,

(completed),

1911 Estimates,

1911 Expenditure,.

696

$40,000 00 38,086.51

Item (i.) This item was described in last year's Report (ride (ii) ) and is now completed.

Item (ii.) This work was undertaken to intercept the drainage from various houses situated within the watershed of the Aberdeen Valley. Only the first section of the work, extending from near R.B.L. 50 to R.B.L's 90, 120 & 127, was undertaken during the year. It consisted of the laying of 6" pipes along Craigmin Road and 4" pipes for the branches to lots.

Item (iii.) This work was required to take the drainage from new houses erected on IL. 1711. It consisted of the laying of a 6" pipe along the pathway to the west of I.L's 1509 & 1570 and the construction of an inspection culvert underneath the Bowen Road Conduit.