year. The positions of the additional lamps will be found in paragraph 91 of this report.

53. Electric Lighting, Kowloon.-No alteration has been made in the number of lamps which remains at 22.

54. Maintenance of Praya Walls and Piers.-The following is a statement of the principal items of expenditure under this vote:- Blake Pier (painting with black Mastic paint, including small repairs), $1,733

Praya East Sea-wall (filling in with cement concrete hollows at back of wall), 946

Sea-wall adjoining K.M.L. 42 (constructing wall at end of public road adjoining lots reclaimed during recent years), 620

Kennedy Town Pier (general repairs), 522

Causeway Bay pitched slope (filling in with cement concrete hollows at back of pitching), 480

Water Police Pier, Kowloon Point, (general repairs), 404

Murray Pier (temporary), (general repairs), 372

Kowloon City Pier, do., 266

- 1,004

Wages of bargemen (employed on floating plant which is used for pier work, etc.),-

55. Maintenance of Public Cemetery. The formation of the new terrace to provide for the interment of Non-Christians, which was commenced about the end of 1909, was completed during the year, a retaining wall being built to enable the surplus material resulting from the excavations to be deposited in another part of the cemetery. A portion of the cemetery lying South of the area reserved for the interment of old residents was cleared of trees and undergrowth and laid out for burial purposes.

56. Laying out Chinese Cemeteries and trenching for burials. An account of the work carried out under these headings will be found in paragraph 35 of this report.

57. Exhumation of remains in Cemeteries. work carried out under these headings will be found in paragraph 35 of this report.

58. Maintenance of Public Recreation Grounds.—The various grounds were maintained in good order. The fence round that portion of King's Park allotted to Yaumati School was repaired at a cost of $52.00 and the turf on the Wongneichong Recreation Ground was patched at a cost of $209.00. The filling in of the area on the East side of Tai Hang Nullah, with a view to the extension of the Queen's Recreation Ground, which was referred to in last year's report, was completed at a total cost of $2,690.43, of which $1,690.43 was expended in 1910.

In consequence of the formation of a Chinese Recreation Club, an allotment for a period of 5 years, commencing from the 1st October, of an area measuring about 410 × 335' (3.15 acres) on the Queen's Recreation Ground was made to it upon certain conditions. The area referred to was rendered available by carrying out certain alterations, including a further diversion of the road leading to Tai Hang Village. The total cost of these alterations, including

Page 20

Page 375

Page 376

Edit History

2026-05-06 01:41:05 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
P 20 year. The positions of the additional lamps will be found in paragraph 91 of this report. 53. Electric Lighting, Kowloon.-No alteration has been made in the number of lamps which remains at 22. 54. Maintenance of Praya Walls and Piers.-The following is a statement of the principal items of expenditure under this vote:- Blake Pier (painting with black Mastic paint, including small repairs), $1,733 Praya East Sea-wall (filling in with cement concrete hollows at back of wall), 946 Sea-wall adjoining K.M.L. 42 (constructing wall at end of public road adjoining lots reclaimed during recent years), 620 Kennedy Town Pier (general repairs), 522 Causeway Bay pitched slope (filling in with cement concrete hollows at back of pitching), 480 Water Police Pier, Kowloon Point, (general repairs), 404 Murray Pier (temporary), (general repairs), 372 Kowloon City Pier, do., 266 - 1,004 Wages of bargemen (employed on floating plant which is used for pier work, etc.),- 55. Maintenance of Public Cemetery. The formation of the new terrace to provide for the interment of Non-Christians, which was commenced about the end of 1909, was completed during the year, a retaining wall being built to enable the surplus material resulting from the excavations to be deposited in another part of the cemetery. A portion of the cemetery lying South of the area reserved for the interment of old residents was cleared of trees and undergrowth and laid out for burial purposes. 56. Laying out Chinese Cemeteries and trenching for burials. An account of the work carried out under these headings will be found in paragraph 35 of this report. 57. Exhumation of remains in Cemeteries. work carried out under these headings will be found in paragraph 35 of this report. 58. Maintenance of Public Recreation Grounds.—The various grounds were maintained in good order. The fence round that portion of King's Park allotted to Yaumati School was repaired at a cost of $52.00 and the turf on the Wongneichong Recreation Ground was patched at a cost of $209.00. The filling in of the area on the East side of Tai Hang Nullah, with a view to the extension of the Queen's Recreation Ground, which was referred to in last year's report, was completed at a total cost of $2,690.43, of which $1,690.43 was expended in 1910. In consequence of the formation of a Chinese Recreation Club, an allotment for a period of 5 years, commencing from the 1st October, of an area measuring about 410 × 335' (3.15 acres) on the Queen's Recreation Ground was made to it upon certain conditions. The area referred to was rendered available by carrying out certain alterations, including a further diversion of the road leading to Tai Hang Village. The total cost of these alterations, including Page 20 Page 375 Page 376
Baseline (Original)
P 20 year. The positions of the additional lamps will be found in para- graph 91 of this report. 53. Electric Lighting, Kowloon.-No alteration has been made in the number of lamps which remains at 22. 54. Maintenance of Praya Walls and Piers.-The following is a statement of the principal items of expenditure under this vote:- Blake Pier (painting with black Mastic paint, includ- ing small repairs), Praya East Sea-wall (filling in with cement concrete hollows at back of wall), - Sea-wall adjoining K.M.L. 42 (constructing wall at end of public road adjoining lots re- claimed during recent years), $1,733 946 620 Kennedy Town Pier (general repairs), - 522 Causeway Bay pitched slope (filling in with cement concrete hollows at back of pitching), 480 Water Police Pier, Kowloon Point, (general repairs), Murray Pier (temporary), (general repairs), 404 372 Kowloon City Pier, do.. 266 - 1,004 Wages of bargemen (employed on floating plant which is used for pier work, etc.),- E5. Maintenance of Public Cemetery. The formation of the new terrace to provide for the interment of Non-Christians, which was commenced about the end of 1909, was completed during the year, a retaining wall being built to enable the surplus material resulting from the excavations to be deposited in another part of the cemetery. A portion of the cemetery lying South of the area reserved for the interment of old residents was cleared of trees and undergrowth and laid out for burial purposes. 56. Laying out Chinese Cemeteries and trenching for burials. An account of the 57. Exhumation of remains in Cemeteries. work carried out under these headings will be found in paragraph 35 of this report. 58. Maintenance of Public Recreation Grounds.—The various grounds were maintained in good order. The fence round that portion of King's Park allotted to Yaumati School was repaired at a cost of $52.00 and the turf on the Wongneichong Recreation Ground was patched at a cost of $209.00. The filling in of the area on the East side of Tai Hang Nullah, with a view to the extension of the Queen's Recreation Ground, which was referred to in last year's report, was completed at a total cost of $2,690.43, of which $,1,690.43 was expended in 1910. In consequence of the formation of a Chinese Recreation Club, an allotment for a period of 5 years, commencing from the 1st October, of an area measuring about 410 × 335' (3'15 acres) on the Queen's Recreation Ground was made to it upon certain condi- ditions. The area referred to was rendered available by carrying out certain alterations, including a further diversion of the road leading to Tai Hang Village. The total cost of these alterations, including Page 375Page 376
2026-05-06 01:41:05 · Baseline
View content

P 20

year. The positions of the additional lamps will be found in para- graph 91 of this report.

53. Electric Lighting, Kowloon.-No alteration has been made in the number of lamps which remains at 22.

54. Maintenance of Praya Walls and Piers.-The following is a statement of the principal items of expenditure under this vote:- Blake Pier (painting with black Mastic paint, includ-

ing small repairs),

Praya East Sea-wall (filling in with cement concrete

hollows at back of wall), -

Sea-wall adjoining K.M.L. 42 (constructing wall at end of public road adjoining lots re- claimed during recent years),

$1,733

946

620

Kennedy Town Pier (general repairs), -

522

Causeway Bay pitched slope (filling in with cement

concrete hollows at back of pitching),

480

Water Police Pier, Kowloon Point, (general repairs), Murray Pier (temporary), (general repairs),

404

372

Kowloon City Pier,

do..

266

-

1,004

Wages of bargemen (employed on floating plant which

is used for pier work, etc.),-

E5. Maintenance of Public Cemetery. The formation of the new terrace to provide for the interment of Non-Christians, which was commenced about the end of 1909, was completed during the year, a retaining wall being built to enable the surplus material resulting from the excavations to be deposited in another part of the cemetery. A portion of the cemetery lying South of the area reserved for the interment of old residents was cleared of trees and undergrowth and laid out for burial purposes.

56. Laying out Chinese Cemeteries and

trenching for burials.

An account of the

57. Exhumation of remains in Cemeteries. work carried out under these headings will be found in paragraph 35 of this report.

58. Maintenance of Public Recreation Grounds.—The various grounds were maintained in good order. The fence round that portion of King's Park allotted to Yaumati School was repaired at a cost of $52.00 and the turf on the Wongneichong Recreation Ground was patched at a cost of $209.00. The filling in of the area on the East side of Tai Hang Nullah, with a view to the extension of the Queen's Recreation Ground, which was referred to in last year's report, was completed at a total cost of $2,690.43, of which $,1,690.43 was expended in 1910.

In consequence of the formation of a Chinese Recreation Club, an allotment for a period of 5 years, commencing from the 1st October, of an area measuring about 410 × 335' (3'15 acres) on the Queen's Recreation Ground was made to it upon certain condi- ditions. The area referred to was rendered available by carrying out certain alterations, including a further diversion of the road leading to Tai Hang Village. The total cost of these alterations, including