AnnualReport-1909 — Page 435

Administrative Reports 行政報告書 All AI Reviewed

Q 5

of 1907.

to date.

Estimate Expenditure Estimate to Final

complete. Estimate.

$5 $ $3 $

Service Road,.... 23,900 5,000 1,000 6,000

Excavation in Hung Hom

Cutting and Reclam-

ation, 522,500 443,606 142,000 585,606

Claims by Leigh and Or-

ange, 10,000 10,000

Alterations to Drains and

Sewers, 66,000 53,000 12,000 65,000

Sea Wall:

Dredging, etc., 84,000 123,730 10,000 139,700

Sea wall as per Original

Design, 129,800 174,200 4,800 179,000

Retain Wall in Cutting,

abandoned for Tun-

nel No. 1. 47,100

Substituted Estimate for

cutting down Signal Hill in case of terminus be- ing at Tsim Ssa Tsui,..

General Earthwork out-

side above, ..

Overland Route, Depreciation of Plant, 40,000 40,000

1,527,200 1,378,374 114,600 1,492,974

6,300 3,000 9,300

60,000 60,000

403,400 2,587,580

Total,. $ 2,400,500 2,184,180

From this it will be seen that the Estimate for the completion of the Earthwork now amounts to $2,587,580, an excess of $319,403 over the Estimate of 1909 and of $187,080 over the Estimate for 1907. It is impossible owing to absence of detailed figures in the Estimate for 1909 to explain how and where this excess has arisen and one can only say that notwithstanding the saving in the quantity of reclamation which amounts to some sixty lacs of cubic feet, the actual figures in Estimates for 1907 and 1910 for the work in Hung Hom vary as shown in the table on account of higher rates having to be paid than those originally estimated for. A further excess is the inclusion of the $60,000 now charged off as deprecia- tion of plant. This was not made in the previous estimates. Of the $114,600 required to complete the Earthwork outside Messrs. Leigh and Orange's contracts it will be seen from the details given below that a sum of $59,600 is set down for works not previously contemplated but which are now necessary to render the cuttings and the banks safe.

Page 435

Page 436

Edit History

2026-05-06 00:25:37 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
Q 5 of 1907. to date. Estimate Expenditure Estimate to Final complete. Estimate. $5 $ $3 $ Service Road,.... 23,900 5,000 1,000 6,000 Excavation in Hung Hom Cutting and Reclam- ation, 522,500 443,606 142,000 585,606 Claims by Leigh and Or- ange, 10,000 10,000 Alterations to Drains and Sewers, 66,000 53,000 12,000 65,000 Sea Wall: Dredging, etc., 84,000 123,730 10,000 139,700 Sea wall as per Original Design, 129,800 174,200 4,800 179,000 Retain Wall in Cutting, abandoned for Tun- nel No. 1. 47,100 Substituted Estimate for cutting down Signal Hill in case of terminus be- ing at Tsim Ssa Tsui,.. General Earthwork out- side above, .. Overland Route, Depreciation of Plant, 40,000 40,000 1,527,200 1,378,374 114,600 1,492,974 6,300 3,000 9,300 60,000 60,000 403,400 2,587,580 Total,. $ 2,400,500 2,184,180 From this it will be seen that the Estimate for the completion of the Earthwork now amounts to $2,587,580, an excess of $319,403 over the Estimate of 1909 and of $187,080 over the Estimate for 1907. It is impossible owing to absence of detailed figures in the Estimate for 1909 to explain how and where this excess has arisen and one can only say that notwithstanding the saving in the quantity of reclamation which amounts to some sixty lacs of cubic feet, the actual figures in Estimates for 1907 and 1910 for the work in Hung Hom vary as shown in the table on account of higher rates having to be paid than those originally estimated for. A further excess is the inclusion of the $60,000 now charged off as deprecia- tion of plant. This was not made in the previous estimates. Of the $114,600 required to complete the Earthwork outside Messrs. Leigh and Orange's contracts it will be seen from the details given below that a sum of $59,600 is set down for works not previously contemplated but which are now necessary to render the cuttings and the banks safe. Page 435 Page 436
Baseline (Original)
Q 5 of 1907. to date. Estimate Expenditure Estimate to Final complete. Estimate. $5 $ $3 $ Service Road,.... 23,900 5,000 1,000 6,000 Excavation in Hung Hom Cutting and Reclam- ation, 522,500 443,606 142,000 585,606 Claims by Leigh and Or- ange, 10,000 10,000 Alterations to Drains and Sewers, 66,000 53,000 12,000 65,000 Sea Wall: Dredging, etc., 84,000 123,730 10,000 139,700 Sea wall as per Original Design, 129,800 174,200 4,800 179.000 Retain Wall in Cutting, fabandoned for Tun- nel No. 1. 47,100 Substituted Estimate for cutting down Signal Hill in case of terminus be- ingat Tsim Ssa Tsui,.. General Earthwork out- side above, .. Overland Route, Depreciation of Plant, 40,000 40,000 1,527,200 1,378,374 114,600 1,492,974 6,300 3,000 9,300 60,000 60,000 403,400 2,587,580 Total,. $ 2,400,500 2,184,180 From this it will be seen that the Estimate for the completion of the Earthwork now amounts to $2,587,580, an excess of $319,403 over the Estimate of 1909 and of $187,080 over the Estimate for 1907. It is impossible owing to absence of detailed figures in the Estimate for 1909 to explain how and where this excess has arisen and one can only say that notwithstanding the saving in the quantity of reclamation which amounts to some sixty lacs of cubic feet, the actual figures in Estimates for 1907 and 1910 for the work in Hung Hom vary as shown in the table on account of higher rates having to be paid than those originally estimated for. A further excess is the inclusion of the $60,000 now charged off as deprecia- tion of plant. This was not made in the previous estimates. Of the $114,600 required to complete the Earthwork outside Messrs. Leigh and Orange's contracts it will be seen from the details given below that a sum of $59,600 is set down for works not previously contemplated but which are now necessary to render the cuttings and the banks safe. Page 435Page 436
2026-05-06 00:25:37 · Baseline
View content

Q 5

of 1907.

to date.

Estimate Expenditure Estimate to Final

complete. Estimate.

$5

$

$3

$

Service Road,....

23,900

5,000

1,000

6,000

Excavation in Hung Hom

Cutting and Reclam-

ation,

522,500

443,606

142,000 585,606

Claims by Leigh and Or-

ange,

10,000 10,000

Alterations to Drains and

Sewers,

66,000

53,000 12,000 65,000

Sea Wall:

Dredging, etc.,

84,000 123,730

10,000 139,700

Sea wall as per Original

Design,

129,800

174,200

4,800 179.000

Retain Wall in Cutting,

fabandoned for Tun-

nel No. 1.

47,100

Substituted Estimate for

cutting down Signal Hill in case of terminus be- ingat Tsim Ssa Tsui,.. General Earthwork out-

side above, ..

Overland Route, Depreciation of Plant,

40,000 40,000

1,527,200 1,378,374

114,600 1,492,974

6,300

3,000

9,300

60,000

60,000

403,400 2,587,580

Total,.

$ 2,400,500 2,184,180

From this it will be seen that the Estimate for the completion of the Earthwork now amounts to $2,587,580, an excess of $319,403 over the Estimate of 1909 and of $187,080 over the Estimate for 1907. It is impossible owing to absence of detailed figures in the Estimate for 1909 to explain how and where this excess has arisen and one can only say that notwithstanding the saving in the quantity of reclamation which amounts to some sixty lacs of cubic feet, the actual figures in Estimates for 1907 and 1910 for the work in Hung Hom vary as shown in the table on account of higher rates having to be paid than those originally estimated for. A further excess is the inclusion of the $60,000 now charged off as deprecia- tion of plant. This was not made in the previous estimates. Of the $114,600 required to complete the Earthwork outside Messrs. Leigh and Orange's contracts it will be seen from the details given below that a sum of $59,600 is set down for works not previously contemplated but which are now necessary to render the cuttings and the banks safe.

Page 435Page 436