Q 5
of 1907.
to date.
Estimate Expenditure Estimate to Final
complete. Estimate.
$5 $ $3 $
Service Road,.... 23,900 5,000 1,000 6,000
Excavation in Hung Hom
Cutting and Reclam-
ation, 522,500 443,606 142,000 585,606
Claims by Leigh and Or-
ange, 10,000 10,000
Alterations to Drains and
Sewers, 66,000 53,000 12,000 65,000
Sea Wall:
Dredging, etc., 84,000 123,730 10,000 139,700
Sea wall as per Original
Design, 129,800 174,200 4,800 179,000
Retain Wall in Cutting,
abandoned for Tun-
nel No. 1. 47,100
Substituted Estimate for
cutting down Signal Hill in case of terminus be- ing at Tsim Ssa Tsui,..
General Earthwork out-
side above, ..
Overland Route, Depreciation of Plant, 40,000 40,000
1,527,200 1,378,374 114,600 1,492,974
6,300 3,000 9,300
60,000 60,000
403,400 2,587,580
Total,. $ 2,400,500 2,184,180
From this it will be seen that the Estimate for the completion of the Earthwork now amounts to $2,587,580, an excess of $319,403 over the Estimate of 1909 and of $187,080 over the Estimate for 1907. It is impossible owing to absence of detailed figures in the Estimate for 1909 to explain how and where this excess has arisen and one can only say that notwithstanding the saving in the quantity of reclamation which amounts to some sixty lacs of cubic feet, the actual figures in Estimates for 1907 and 1910 for the work in Hung Hom vary as shown in the table on account of higher rates having to be paid than those originally estimated for. A further excess is the inclusion of the $60,000 now charged off as deprecia- tion of plant. This was not made in the previous estimates. Of the $114,600 required to complete the Earthwork outside Messrs. Leigh and Orange's contracts it will be seen from the details given below that a sum of $59,600 is set down for works not previously contemplated but which are now necessary to render the cuttings and the banks safe.
Page 435
Page 436
Q 5
of 1907.
to date.
Estimate Expenditure Estimate to Final
complete. Estimate.
$5
$
$3
$
Service Road,....
23,900
5,000
1,000
6,000
Excavation in Hung Hom
Cutting and Reclam-
ation,
522,500
443,606
142,000 585,606
Claims by Leigh and Or-
ange,
10,000 10,000
Alterations to Drains and
Sewers,
66,000
53,000 12,000 65,000
Sea Wall:
Dredging, etc.,
84,000 123,730
10,000 139,700
Sea wall as per Original
Design,
129,800
174,200
4,800 179.000
Retain Wall in Cutting,
fabandoned for Tun-
nel No. 1.
47,100
Substituted Estimate for
cutting down Signal Hill in case of terminus be- ingat Tsim Ssa Tsui,.. General Earthwork out-
side above, ..
Overland Route, Depreciation of Plant,
40,000 40,000
1,527,200 1,378,374
114,600 1,492,974
6,300
3,000
9,300
60,000
60,000
403,400 2,587,580
Total,.
$ 2,400,500 2,184,180
From this it will be seen that the Estimate for the completion of the Earthwork now amounts to $2,587,580, an excess of $319,403 over the Estimate of 1909 and of $187,080 over the Estimate for 1907. It is impossible owing to absence of detailed figures in the Estimate for 1909 to explain how and where this excess has arisen and one can only say that notwithstanding the saving in the quantity of reclamation which amounts to some sixty lacs of cubic feet, the actual figures in Estimates for 1907 and 1910 for the work in Hung Hom vary as shown in the table on account of higher rates having to be paid than those originally estimated for. A further excess is the inclusion of the $60,000 now charged off as deprecia- tion of plant. This was not made in the previous estimates. Of the $114,600 required to complete the Earthwork outside Messrs. Leigh and Orange's contracts it will be seen from the details given below that a sum of $59,600 is set down for works not previously contemplated but which are now necessary to render the cuttings and the banks safe.