22
Purpose or service.
Fecs. $
(b) For unclassed ships-
Standard foes $
Tonnage
Survey
Periodical Inspec-
tion
0)
(2)
Under
50 tons and under
50 tons 100
735
120
1,463
205
100
H
CE
300
+
+
-་་--་་་ས -་
1,965
263
300
500
14
41
w
2,643
350
500
H
我
1,000
3,410
470
1,000
1,500
4,415
58.5
1,500
购
+4
2,000
5,050
705
2,000
灿
H
2,500
3.75$
706
2,500
啊
14
3,000
6,440
795
3,000
*
+4
4,000
7,100
910
4,000
PT
П
5,000
n
7.805
910
5,000
*
6,000
8,505
910
6,000
7,000
9.145
910
7,000
8,000
9,850
910
8,000
M
9,000
10,550
910
9,000 10,000
10,000
11.255
910
FF
above
11,960
910
Plus $750 for every
1,000 tons of part of
(c) For every periodical inspection of a ship of over 300 tous (classed or unclassed) which is carried through in one operA- tion-
(1) When only one visit is necessary
(ii) Whea
necessary
1,000 tons by which The tonnage exceeds
11,000 ton.
Fee as in tabl (2) or (b).
noore than one visit
Fee in table (a) or (6) plus $235.00.
(d) For every periodical inspection of a chip (classed or unclassed) which is not carried through in one operation-
(i) For every partial periodical inspec- tion of a ship of 300 tons or less
235.00
(i) For ship of over 300 tons, for every partial periodical inspection requiring one visit
233.00
(iii) For every partial periodical inspec- tion requiring more than one visit
470.00
23
Fees.
Purpose or service.
(e) For the survey of a classed ship for renewal of load line cortificate, when the survey is not carried out at the samO time as the classification Kurvey
Ja
() For the survey for the issue or renewal of a load line certificate if the survey is carried out at the same time as a survey for a passenger certificate-
སྠཽ ཀཾ ས - -
(D) A classed ship (i) An unclassed ship
(8) For the periodical inspection where such inspection is carried out by a Hong Kong Government surveyor of ships at the same time as an intermediate Cargo Ship Safety Construction Survey
(6) For the periodical inspection where auch inspection is carried out at the same time as a survey for a passenger certifi- cate (classed or unclassed ship)
(0 For a survey, not being a full survey, for a change of free-board consequent upon minor alterations (classed or welaased ship)
Финарни изчанин
0 In special cases, for a partial survey and the issue or renewal of a certificate for twelve months or less
... r----༞II
(*) For information concerning the draught of water of a ship on her proceeding from Hong Kong on a particular voyage, at the request of the owners or charterers (For the consideration of stability infor
malion
2. Fees for survey of ships detained because
they are alleged to be unseaworthy--
(a) For the survey of a ship which is detained (other than upon the complaint of the crew) on account of overloading. improper loading, insufficient ventilation of coal cargoes, undermanning, or delec- tive equipment (such as chronometers or charts etc.)--
In the case of a ship of—
(i) under 500 tons
i of the fee in Col. (1) of table (a).
Nil.
↑ of the fee in Col. (1) of table (8).
Nil
Nit.
Fee in Col. (2) of table (4)
4 of the fee in Col. (1) of table (a) or (b),
125.00
Fee in Col. (1) of tabic (a).
$85.00
(0) 500 tons and under 750 tons
705.00
(ii) 750 tons and under 1,000 tons (iv) 1,000 tons and above, for every
795.00
additional 500 tons ...skrevenuesit
125.00
No comments yet.
Private notes are available after approval.