1962-HKRS30-8-53_Part01 — Page 24

Authenticated Laws 確真本香港法例 All

*Auxiliary equipment (including the fuel burning installation) examined and found satisfactory.

Signature

Date

"Boiler examined under hydraulic test of

Signature ...............+44

p.s.i.

Date

*Pressure receiver cxamined under hydraulic test of ---, ------------་ ་ ་-----་ p.s.i.

Fittings examined and found satisfactory.

3

Signature

Date

Signature

Date

"Miscellaneous inspections:-

*In accordance with section 28, the steam container connected to the boiler has been examined and the outlet therefrom found to be open and free from obstruction.

Signature

Darc

Signature

Dare

I certify that I have this day examined the above boiler under pressure and I am satisfied that it is in safe working order and may be used and operated at a maximum permissible working pressure of

*subject to there insert any conditions imposed under section 33(5) of the Ordinance)

I certify that I have this day examined the above pressure receiver under pressure and I am satisfied that it is in safe working order and may be used at a maximum permissible working pressure of

"subject to there insert any conditions required under section 33(5) of the Ordinance)

Dare

• Exelene if moa. Applicable.

More

* Bofler Inspector.

• Ab Receiver Inspector,

Daless an exler examinación la requined to collequence of why condition endorsed on thin certificate or by poker requirements of the Ordinance. tala ceruzate je wadd in accordance whh section 37080 at the Bollers and Pressure Receiver Ordmarice. 1961 wall

19......

Date

* Delete if not applicable.

Boiler Inspector.

Nere: Unless an sieliet exhomioptipa ln required in consequence of any condition adored the th

ceniticum ex by other requlicmendeb the Ordinance. this canincate be valid in accordance with section 27a) of the Boiler and Pressure Receivers Ordinance. 1962. kl

ly.

FORM 2

BOILERS AND Pressure Receivers Ordinance, 1962. CERTIFICATE OF FITNESS FOR A PRESSURE RECEIVER (OTHER THAN A PRESSURE VESSEL).

KAJAKKER konta

Registration number of pressure receiver

Name of owner

Address of owner

Address of installation

Description of pressure receiver

Particulars of test:

Pressure receiver examined internally and

Signature

externally and found to be or placed in a satisfactory condition.

Date

Date of construction

FORM 3.

BOOLERS AND PRESSURE REceivers OrdiNANCE, 1962.

APPLICATION FOR REGISTRATION.

TO THE REDISTRAR

Sir,

Part 1

I. the undersigned, residing at

hereby apply for registration of the following items in accordance with the provisions of the above Ordinance—

*Boiler

Туре

Date of manufacture

This boiler is/is not one of a range of boilers.

This boiler /is not designed to be transportable from one place

to another.

This boiler is "new/existing within the meaning of the Ordinance. *Steam container

This steam container *is/is not connected to the boiler described

Above.

This steam container to *new/existing within the meaning of the

Ordinance.

́steam receiver

*Pressure receiver Type air receiver

portable gas

generator

Date of manufacture ........................

This pressure receiver isfis not designed to be transportable from

one place to another.

This pressure vessel is "new/existing within the meaning of the

Ordinance.

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.