1960-HKRS29-8-27_Part05 — Page 12

Authenticated Laws 確真本香港法例 All

30

No. of lift marked thereon and shown on plon prepared in accordance with section 33 of the Lifts and Esculators (Safety) Ordinance, 1960)

#咖咖啡

was examined and the safety equipment provided therefor was tested, in accordance with the provisions of section 12(1) of the Lifts and Escalators (Safety) Ordinance, 1960, by me on the

ar

10.......

1 am satisfied that, on the

day of

the above lift/escalator was in safe working order.

19

day

Signature of registered lift engineer} registered escalator engineer,

Signature of registered lift contractor! registered escalator contractor.

GOVERNMENT OF HONG KONG.

FORM 6.

LIFTS AND ESCALATORS (SAFETY) ORDINANCE, 1960.

Sections 1203a), 14(2), 17(1) and (2) and 36(2)(a). Permit to use and operate a new lift or escalator.

Public Works Department, Hong Kong.

31

GOVERNMENT OF HONG KONG.

FORM 7.

LIFTS AND ESCALATORS (SAFETY) ORDINANCE, 1960. Section 13(2),

Certificate on examination and testing of lift in respect of which lift works consisting of major alterations have been carried our or of escalator in respect of which escalator works consisting of the alteration of the speed, operation or design thereof have been carried out.

To the Director of Public Works.

י ו4י

19

registered lift engincer, certify that the lif installed at (No. and name of street and, where more than one fift is installed in the building, specify No. of lift marked thereon and shown on plan prepared in accordance with section 33 of the Lifts and Escalators (Safety) Ordinance, 1960)

in respect of which lift works consisting of major alterations have been carried out was examined and tested by me, în accordance with the provisions of section 13(1) of the Lifts and Escalators (Safety) Ordinance, 1960, on the

day of

19

1.

........... registered escalator engineer, certify that the escalator installed at (No, and namic of Street, and, where more than one cscalator is installed in the building, specify No. of escalator marked thereon and shown on plan prepared in accordance with section 33 of the Lifts and Escalators (Safety) Ordinance, 1960)

in respect of which escalator works consisting of the alteration of the speed/ operation/design thereof have been carried out was examined and tested by me, in accordance with the provisions of section 13(1) of the Lifts and Escalators (Safety) Ordinance, 1960, on the

day of

19

day of peo

1 am satisfied that, on the 19...... those parts of the lift/escalator affected by the above lift works/ cscalator works were in safe working order.

Pursuant to the provisions of

Delete whichever

(6) paragraph (a) of subsection (3) of section 12 (6) subsection (2) of section 14

Delete whichever is inapplicable.

En Janko 4-

(c) subsection (1) of section 17

Signature of registered lift engineer) registered escalator engineer.

Signature of registered lift contractor)

registered escalator contractor.

(4) subsection (2) of section 17

(e) paragraph («) of subsection (2) of section 36

of the Lifts and Escalators (Safety) Ordinance, 1960.

I hereby permit the use and operation of the new lift/escalator installed at (No, and name of street and, where more than one lift or escalator is installed in the building, specify No. of lift marked thereon and shown on plan prepared in accordance with section 33 of the Lifts and Escalator (Safety) Ordinance, 1960)

GOVERNMENT OF HONG KONG.

FORM &

LIFTS AND ESCALATORS (SAFETY) ORDINANCE, 1960. Sections 13(3X2), 14(2), 17(1) and (2) and 36(2)(6), Permit to resume use and operation of lift in respect of which major alterations have been made or of escalator in respect of which there has been an alteration of speed, operation or design,

Public Works Department. Hong Kong.

Director of Public Works.

19

Comments