FIRST SCHEDULE.
A breakwater in Causeway Bay approximately 1,650 feet in length, approximately 810 feet north of and parallel to the existing breakwater, approximately 1,440 feet long, which for the northern boundary of the typhoon shelter in Causeway Ba and shown and delineated in red and marked "NORTH ARM, upon a plan signed by the Director of Public Works and dated the sand day of February, 1951, and deposited in the Land Offic
First COLUMN,
SECOND SCHEDULE.
SECOND COLUMN.
FIRST COLUMN,
Section of Public Reclamationg Validation and Clauses Ordinance, 1936, affected and item thereof.
3. Section 7.
3
SECOND COLUMN.
Detail of variation or exception.
Subsection (1) is varied by the deletion of the words "within two months after the publication of the definitive approval under section 5(5)" in the ninth and tenth lines and by the substitution therefor of the following words "within six months after the coming into force of this Ordinance".
Section of Public Reclamations
Validation and Clauses Ordinance, 1936, affected and item thereof.
1.
Section 5.
2. Section 6.
Detail of variation or axçaption.
(1) Subsections (1), (4), (5) and (6) are
excepted.
(2) Subsection (2) is deleted and replaced by
the following subsection---
(2) All persons having any claims o private right in respect of the under taking authorized by this Ordinance shal send in their claims of right in writing, specifying the nature of such claims, to the Director of Public Works within twD months after the coming into force of this Ordinance.".
ני 5*
(3) Subsection (3) is varied by the deletion
therefrom-
(a) of the words "objections and" appear
ing in the first line; and
(b) of the words "objection or" appeati
ing in the third line.
Is varied by the deletion of the words "upon the publication of such definitiv approval" appearing in the second line.
Passed the Legislative Council of Hong Kong, this 2nd day of May, 1951.