- 39.

5. 40,000 Ton Lifting Capacity Floating Dock, Yam O,

North Lantau, EIA final report

(Hong Kong United Dockyards Ltd)

Major EIAs that are likely to be completed in the next 12 months include:

1. Ting Kau & Sham Tseng Sewerage Scheme

(Drainage Services Department)

2. Feasibility Study for Castle Peak Road Improvement between Area 2 and Ka Loon Tsuen, Tsuen Wan (Highways Department)

3. Backfilling of Marine Borrow Pits North Lantau and

South Tsing Yi, Feasibility Study/ EIA

(Civil Engineering Department)

4. West Kowloon Refuse Transfer Station Detailed EIA

(Environmental Protection Department)

5. Green Island Cement Manufacturing and Concrete

Batching Area 17, Southwest Tsing Yi

(Green Island Cement Co Ltd)

6. Route 3 Tai Lam Tunnel & Yuen Long Approach-

southern Section - Final Detailed EIA

(Route 3 Contractors Consortium)

7. Hong Kong Cement/Concrete Batching Plant and

Material Storage Facilities at Northwest Tsing Yi Island (Hong Kong Cement Co Ltd)

8. Main Drainage Channel for Fanling, Sheung Shui and Hinterland

(Civil Engineering Department)

9. Main Drainage Channels for Ngau Tam Mei, Yuen Long and Kam Tin

(Territory Development Department)

10. Outlying Island Refuse Transfer Facilities

(Environmental Protection Department)

E

Share This Page