SUNDAY, FEBRUARY 27, 1994
ENGINEERING FEASIBILITY STUDY OF TSEUNG KWAN О AREA 137 (TERRITORY DEVELOPMENT DEPARTMENT, MAY 1993)
SHUEN WAN LANDFILL EXTENSION AND RESTORATION PROTECTION DEPARTMENT, APRIL 1993)
ROCK HILL STREET EXTENSION (HIGHWAYS 1993)
TO THE HONG
(ENVIRONMENTAL
DEPARTMENT, NOVEMBER
AND
PROPOSED EXTENSION
KONG CONVENTION EXHIBITION CENTRE (TERRITORY DEVELOPMENT DEPARTMENT, NOVEMBER 1993)
FAIRWAY TO WENT (WESTERN NEW TERRITORIES) LANDFILL (ENVIRONMENTAL PROTECTION. DEPARTMENT, NOVEMBER 1993)
GOLF COURSE IN TUEN MUN AREA 19 (REGIONAL SERVICES DEPARTMENT, DECEMBER 1993)
+.
400KV ELECTRICAL SUBSTATION IN AREA 115 TSEUNG KWAN 0 (CHINA LIGHT & POWER CO LTD, JANUARY 1993)
TOWNGAS LANTAU LINK (THE HK & CHINA GAS CO LTD, JANUARY 1993)
HOK UN POWER STATION RESIDENTIAL REDEVELOPMENT (CHINA LIGHT & POWER CO LTD, FEBRUARY 1993)
HONG KONG ELECTRIC: ASH LAGOON AT LAMMA ISLAND (THE HONG KONG ELECTRIC CO LTD, MARCH 1993)
HONG KONG ELECTRIC: EXTENSION OF POWER STATION AT LAMMA (UNITS 7 & 8) (THE HONG KONG ELECTRIC CO LTD, APRIL 1993)
LAMMA QUARRY CASTING BASIN AND MODERATE (LAMMA ROCK PRODUCTS LTD, MAY 1993)
QUARRY EXTENSION
REHABILITATION OF ANDERSON ROAD QUARRY (K WAH QUARRY со LTD & PIONEER QUARRIES (HK) LTD, JUNE 1993)
CHINA LIGHT AND POWER: POWER STATION AT BLACKPOINT (CHINA LIGHT & POWER CO LTD, SEPTEMBER 1993)
RELOCATION OF GAS TURBINES FROM HOK UN POWER STATION (CHINA LIGHT & POWER CO LTD, NOVEMBER 1993)
MOBIL OIL TERMINAL: CONTAMINATED SOIL REMEDIATION AT SOUTH- EAST TSING YI SITE (MOBIL OIL (HK) LTD, DECEMBER 1993}
CONCORD OIL: CONTAMINATED SOIL REMEDIATION AT TSING YI (CONCORD OIL (HK) LTD, DECEMBER 1993)
LANTAU AND AIRPORT RAILWAY {MASS TRANSIT CORPORATION, JANUARY 1994)
SOUTH-EAST
RAILWAY
EIAS THAT ARE LIKELY TO BE COMPLETED IN THE NEXT 12 MONTHS:
*
TUEN MUN PORT DEVELOPMENT (TERRITORY DEVELOPMENT DEPARTMENT}
/*RELOCATION OF