SATURDAY, JULY 3, 1982
5
TEMPORARY ROAD CLOSURE IN SHA TIN
****
THE SLIP ROAD LEADING FROM FO TAN ROAD TO TAI PO ROAD SOUTHBOUND WILL BE CLOSED ON MONDAY (JULY 5) BETWEEN 9.30 AM AND 4.30 PM FOR ROAD WORKS,
DURING THE CLOSURE, VEHICLES FROM THE FO TAN AREA HEADING FOR KOWLOON WILL HAVE TO USE YUEN WO ROAD, SHA TIN RURAL COMMITTEE ROAD AND TAI PO ROAD, OR, ALTERNATIVELY, TAI CHUNG KIU ROAD AND LION ROCK TUNNEL ROAD.
SIGNS WILL BE PUT UP TO GUIDE MOTORISTS.
LEFT TURN BAN IN CHEUNG SHA WAN
****
WESTBOUND VEHICLES ON CHEUNG SHA WAN ROAD WILL BE BANNED FROM TURNING LEFT INTO CHEUNG LAI STREET FROM 10 AM ON MONDAY (JULY 5) FOR CONSTRUCTION WORKS.
THIS WILL LAST UNTIL MONDAY (JULY 19).
MOTORISTS WILL HAVE TO USE KOM TSUN STREET AND CHEUNG SHUN STREET TO REACH CHEUNG LAI STREET,
KMB ROUTE 2F WILL BE DIVERTED FROM CHEUNG LAI STREET TO KOM TSUN STREET, LAI CHI KOK ROAD AND CHEUNG MAU STREET.
SIGNS WILL BE PUT UP TO GUIDE MOTORISTS.