MONDAY, JANUARY 23, 1978
TEMPORARY CLOSURE OF SECTION OF BOUNDARY STREET
*****
THE TRANSPORT DEPARTMENT ANNOUNCED TODAY THAT THE SECTION OF BOUNDARY STREET BETWEEN TAI HANG TUNG ROAD AND EMBANKMENT ROAD WILL BE TEMPORARILY CLOSED BETWEEN 11.55 P.M. ON WEDNESDAY (JANUARY 25) AND 5 A.M. THE FOLLOWING DAY.
THE CLOSURE IS TO FACILITATE THE REMOVAL OF THE TEMPORARY SUPPORTING STRUCTURES ON THE RAILING BRIDGE ACROSS BOUNDARY STREET.
DURING THE CLOSURE PERIOD, SAI YEE STREET BETWEEN FLOWER MARKET ROAD AND BOUNDARY STREET, AND BOUNDARY STREET BETWEEN SA YEE STREET AND TAI HANG TUNG ROAD WILL BE RE-ROUTED TWO-WAY.
OTHER TRAFFIC AFFECTED BY THE ROAD CLOSURE WILL BE DIVERTED AS FOLLOWS:
* EASTBOUND TRAFFIC ON BOUNDARY STREET WILL BE DIVERTED TO
SAI YEE STREET, FLOWER MARKET ROAD, YUEN NGAI STREET, AND EMBANKMENT ROAD TO RE-JOIN BOUNDARY STREET-
*
WESTBOUND TRAFFIC ON PRINCE EDWARD ROAD GOING TO TAI HANG TUNG MAY TURN INTO TUNG CHOI STREET FROM PRINCE EDWARD ROAD AND THEN TO TAI HANG TUNG ROAD VIA BOUNDARY STREET- AND
* TRAFFIC FROM TAI HANG TUNG ROAD GOING TO PRINCE EDWARD ROAD
MAY GO WESTBOUND ON BOUNDARY STREET AND THEN TO PRINCE EDWARD ROAD VIA SAI YEE STREET, FLOWER MARKET ROAD AND YUEN NGA! STREET.
MOTORISTS ARE ADVISED TO DRIVE WITH EXTRA CARE WHEN PASSING THROUGH THE AREA AND APPROPRIATE TRAFFIC SIGNS WILL BE SET UP TO GUIDE THEM.
WATER CUT ***
WATER SUPPLY TO A NUMBER OF PREMISES. IN TUEN MUN INDUSTRIAL AREA WILL BE SUSPENDED FROM 10 A.M. TO 4 P.M. ON THURSDAY (JANUARY 26) TO ALLOW STAFF OF THE WATER SUPPLIES DEPARTMENT TO CARRY OUT WATER PIPE CONNECTION WORK IN CASTLE PEAK ROAD NEAR FU TEI CHUNG TSUEN IN TUEN MUN.
PREMISES TO BE AFFECTED BY THE WATER CUT ARE THOSE IN TUEN MUN INDUSTRIAL AREAS 9 AND 12.