Estimated capital outlay necessary So equip Hong Kong
and Kowloon for systematic waste detection work;
Alterations to distribution systos
Provision of meters
Alterations to private mouse picos
Annual operating cxpenses are esti ated as follows:-
1 European Inspector, including housing,
travelling, transport and poñelon & saj $500 per annum
10 Asiatic Inspectors, includin
using,
travelling, transport and p. mafod 9 say $1,000 each
itters and coolies
Faintenance of meters and equi y ont
Road openings and reinstatomont
Estimated ultimate saving in consumption
$120,000
120,000
60,000
$300,000
$ 8,000
10,000
7,000
·5,000
10,000
$ 40,000
Say 7%
On present maximum consumption sar 2 .C.P.D.
Estimated capital outlay represented by 2 11.0.1.D.
$3,500,000.
Loan Charges on $3,500,000.
Interest and Sinking Fund 70
Deduct
7% on $300,000
$262,500
11/ END
$22,500
Annual charges - salaries
and maintenance
40,000
32,500
Estimated ultimate saving
$200,000 98.
HOTE
An effective waste detection ston will take a fow years
to perfect and during at period was average annual saving would be very considerably loss than $200,000.