Enclosure No.3.

61

Hon. D. P.W,

In my report and estimate dated 31/3/28 the

estimated cost of the W/T improvements necessary was

given as $165,240, this estimate covered the cost of

plant, minor alterations to buildings at D'Aguilar

and the preliminary expenses in connection with a new

site for an additional station.

2.

Since writing this report a site at Victoria

Peak already suitable for the erection of buildings

has been allocated to this Department, this enables

far more. rapid development of the Wireless Service to

take place, and brings into the years 1928 and 1929

expenditure that would otherwise have been delayed to

1930, 1931. It is most desirable that the work be

proceeded with in accordance with my amended estimate

which I attach, as although the expenditure is greatly

increased it ensures that our valuable plant will be

housed in permanent and suitable buildings.

36 The new site being within the fog belt involves

the provision of dehumidifying plant, see item 10.

In addition to the change of site, it is now

proposed to establish a proper Radio Office in the

ground floor of the P. & 0. Building, this will affect

رم

a great improvement in the facilities offered to the

Public for the despatch of telegrams.

5. The total increase in expenditure is

99,400 and is accounted for in the following manner:

-14-

Share This Page